说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 三峡三期工程
1)  Ⅲ-Phase Works of TGP
三峡三期工程
1.
Curtain Grouting Construction & Technology Management of Ⅲ-Phase Works of TGP;
三峡三期工程帷幕灌浆施工与工艺管理
2)  Three Gorges Project Ⅱ stage construction
三峡二期工程
1.
The measures and equipments for temperature control in pouring concrete for Three Gorges Project Ⅱ stage construction are introduced and various factors affecting the pouring temperature are analysed in the paper.
介绍了三峡二期工程砼温度控制措施及设备 ,分析了影响砼浇筑温度的各种因素。
3)  the second phase of the three gorges project
三峡工程二期
4)  Three Gorges Project
三峡工程
1.
Characteristics of Nutrient Structures and Limitation in the Yangtze River Estuary Before and After Water Storage of the Three Gorges Project;
三峡工程蓄水前后长江口水域营养盐结构及限制特征
2.
Distribution of Suspended Matter Concentration in the Changjiang Estuary and Adjacent Area After the First-Stage Storage of the Three Gorges Project;
三峡工程一期蓄水后长江口及其邻近海域悬浮物浓度分布特征
3.
Studies on biological regulation of Three Gorges Project;
三峡工程生态调度的若干探讨
5)  Three Gorge Project
三峡工程
1.
Summarization of Ecological Environment Protection in the Three Gorge Project;
三峡工程的生态与环境保护工作
2.
Research on sediment-reducing benefit in Xiluodu power station for Three Gorge Project;
溪洛渡水电站对三峡工程的减沙效益研究
3.
Safety Standards of Blast Vibrations Adopted in Rock Base Excavation of Three Gorge Project;
三峡工程岩石基础开挖爆破震动控制安全标准
6)  The Three Gorges project
三峡工程
1.
Influence of the Three Gorges Project on Ecology and Environment;
三峡工程对生态与环境的影响
2.
Optimization study on the safety monitoring design of the Three Gorges Project;
三峡工程安全监测设计的优化研究
3.
Quality Control on Concrete Surface of the Three Gorges Project;
三峡工程混凝土外观质量控制
补充资料:长江三峡工程

长江三峡工程,是一项容防洪、发电、航运、养殖和供水于一体的大型综合水利枢纽工程。坝址选在湖北省宜昌县境内三斗坪镇。工程的拦江大坝全长1983,坝顶高程185,大坝高175。水库正常蓄水位175,总库容量为393亿立方米,其中防洪库容量为2215亿立方米。水电站装机26台,总装机容量为1768万千瓦,每年平均发电量为84船亿千瓦·时。工程静态总投资人民币570亿元(1990年价)。主体工程总工期预计15年,第一批发电机组在第9年开始发电。三峡工程的建设,将对增强我国综合国力和为下世纪初国民经济发展打下了坚实基础,意义十分重大。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。