1) 2nd-stage upstream cofferdam of Three Georges Project
三峡工程二期上游围堰
3) TGP stageⅡ cofferdam
三峡二期围堰
1.
The paper has briefly analyzed the construction new techniques and result of the TGP stageⅡ cofferdam safety monitoring, through analysis we consider that 1.
对三峡二期围堰安全监测施工新技术和监测成果进行简要分析,通过分析认为1。
4) RCC cofferdam of TGP
三峡工程RCC围堰
1.
The demolition blasting of RCC cofferdam of TGP is carried out underwater 40 m depth;the analog test is done to examine the watertightness and the bond resistance of blast-hole stems;the details are described.
三峡工程RCC围堰拆除爆破是在水下40 m深处进行,为了验证炮孔封堵材料的密封性和粘着抗力而进行了模拟试验,对试验的细节加以介绍。
5) the 3rd RCC
三期上游围堰
6) the stage III works (RCC Cofferdam project) of the Three Gorges Project
三峡Ⅲ期RCC围堰
补充资料:长江中上游防护林体系工程
长江中上游防护林体系工程
protective forest system engineering in the upper and middle reach of the Yangtze River
ehangjlang zhongshongyou fonghulint一xi gongeheng长江中上游防护林体系工程(protective forest systelnengineering in the叩per and middle reaeh Of the Yangtze凡ver)在中国长江中上游地区建设的以防护林为主的绿化工程。长江中上游包括赣、鄂、湘、川、黔、滇、陕、甘、青9省556个县(含172个贫困县),流域面积160万平方千米,是长江流域水土流失等自然灾害最严重的地区。按照总体规划,一期工程(1988~2(XX)年)首先在145个县内人工造林660万公顷,其中防护林占53.4%,经济林占8.4%,用材林占23.7%。先在35个重点县进行试点,1991年全面铺开。 一期工程完成后可使林木覆盖率由现在的19.9%提高到40.1%,水土流失面积与土壤流失量分别减少38.7%与43%。此外,每年新增社会纯收人约51.76亿元。目前“长防林”体系建设已完成造林面积266万公顷。 “长防林”体系建设工程是继“三北”防护林体系建设工程之后又一个国家重点生态工程,由于工程地区所处的地理位置和优越的自然条件,这项工程建设的成功,将对中国的改革开放和建立社会主义市场经济产生重大影响。(阎树文)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条