1) Three Gorges phase Ⅱ works
三峡二期枢纽工程
2) the second phase of the key water control project at the Three Gorges on the Yangtze River
三峡水利枢纽二期工程
3) Three Gorges Project
三峡水利枢纽工程
1.
Design and experimental verification of gantry crane girder for flood discharge section of Three Gorges project;
三峡水利枢纽工程泄洪坝段门机大梁设计与试验验证
2.
Personnel understanding of the stage acceptance of Three Gorges Project;
三峡水利枢纽工程阶段验收工作体会
3.
After a long summary on project quality control,a detailed quality management system for the third phase construction project of Three Gorges Project is determined.
在长江三峡水利枢纽工程建设中,广大建设者为确保工程质量经历了长期的探索,并最终在三期工程建设中形成了一套较为系统的质量管理模式。
4) Three Gorges Project
三峡枢纽
1.
Demand analysis and forecast on the freight transportation of Three Gorges Project
三峡枢纽过坝运输需求分析及其预测
5) Three Gorges Project Ⅱ stage construction
三峡二期工程
1.
The measures and equipments for temperature control in pouring concrete for Three Gorges Project Ⅱ stage construction are introduced and various factors affecting the pouring temperature are analysed in the paper.
介绍了三峡二期工程砼温度控制措施及设备 ,分析了影响砼浇筑温度的各种因素。
补充资料:葛洲坝水利枢纽二期工程的工地
葛洲坝水利枢纽二期工程的工地
葛洲坝水利枢纽二期工程的工地
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条