说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 三峡工程一期蓄水
1)  Sanxia Reservoir
三峡工程一期蓄水
1.
The Phase-I engineering of Sanxia Reservoir stored water since 2003,there had been not obvious change in the heavy metal deposition mechanism of surface sediments in the Changjiang Estuary,but the contents of heavy metals had a gradually decreasing trend.
自2003年三峡工程一期蓄水完成到2006年6月,长江输沙量逐年减少,长江口海域沉积物中黏土的百分含量明显增加,但是沉积物分布的总体格局并没有发生明显的变化。
2)  the first storage stage of San Xia Project
三峡工程一期蓄水后
3)  the second phase of the key water control project at the Three Gorges on the Yangtze River
三峡水利枢纽二期工程
4)  TGP water-storage
三峡蓄水
5)  Ⅲ-Phase Works of TGP
三峡三期工程
1.
Curtain Grouting Construction & Technology Management of Ⅲ-Phase Works of TGP;
三峡三期工程帷幕灌浆施工与工艺管理
6)  Three Gorges Project Ⅱ stage construction
三峡二期工程
1.
The measures and equipments for temperature control in pouring concrete for Three Gorges Project Ⅱ stage construction are introduced and various factors affecting the pouring temperature are analysed in the paper.
介绍了三峡二期工程砼温度控制措施及设备 ,分析了影响砼浇筑温度的各种因素。
补充资料:三峡
1.四川﹑湖北两省境内,长江上游的瞿塘峡﹑巫峡和西陵峡的合称。 2.广东省北江自英德至清远间的中宿峡﹑大庙峡﹑浈阳峡的合称。见清屈大均《广东新语.三峡》。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条