说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三峡工程二期
1.
Finite Element Analyses of Schemes of Low and High Core Walls of Second Stage Cofferdam for Three Gorges Project
三峡工程二期围堰低高防渗心墙方案的有限元分析
2.
Influence of the Second Phase Water Level of the Three Gorges Dam Project upon the Tourism Development in Chongqing Reservoir Area;
长江三峡工程二期水位后对重庆库区旅游发展的影响及对策
3.
According to presentations, the second phase project of the Three Gorges Project mainly includes bids such as the flood discharge dam, the factory protection dam and the factory buildings, etc.
据介绍,三峡工程二期工程主要包括泄洪大坝、厂房大坝及厂房等标段。
4.
PICC Property contracts the largest bid of the second phase of the Three Gorges Project
中保财险公司承保三峡二期工程最大标段
5.
Research on the Compensation of Concrete Crevice Treatment on the Upper & Down Stream Dam Surface of the Three Gorges Project;
三峡二期工程大坝上下游面混凝土裂缝处理变更补偿问题探析
6.
Temperature Control and Anti-crack Technique in the Construction of LOT II A of the Left Bank Plant Section of the Secondary Phase of the Three Gorges Project
三峡二期工程左岸厂房坝段ⅡA标段混凝土温控及防裂技术
7.
Practice on the Third Phase Construction and Management of Three Gorges Project
长江三峡水利枢纽三期工程建设管理实践
8.
Quality Management for the Third Phase Construction of Three Gorges Project
长江三峡水利枢纽三期工程质量管理简介
9.
The Three Gorges Project is a large-scale project with long construction period and large investment demand.
三峡工程规模巨大,建设工期长,投资需求大。
10.
when the project is completed,
在三峡工程完全竣工前,
11.
Three Gorges Right Bank First-stage River Diversion Concrete Dam Body Joint Grouting
三峡右岸一期导流工程混凝土坝体接缝灌浆
12.
Analysis of long-term development tendency of comprehensive benefits of TGP;
三峡工程综合效益的长期发展趋势分析
13.
Long Age Performance Test of Dam Concrete of Three Gorges Project
三峡工程大坝混凝土长龄期性能试验研究
14.
Study on Connecting System Scheme for First Phase Project of Yellow River Wind Farm Located at Sanmenxia
三门峡黄河风电场一期工程并网方案研究
15.
On February 28th, the Three Gorges Branch of the Bank of China signed the agreement contract with the Yangtze River Three Gorges Project Development Corporation of China to transfer the loan of the project.
二月二十八日,中国银行三峡分行与中国长江三峡工程开发总公司签订了项目转贷协议合同。
16.
Comprehensive construction technology for the open channel clos ure and the third stage of earth-rock cofferdam at Three Gorges Project
三峡明渠截流与三期土石围堰工程综合施工技术
17.
Research and practice on new technology of concrete rapid construction in Three Gorges project
三峡三期工程大坝混凝土优质快速施工新技术研究及实践
18.
The Surveillance and Study of Thermal-Creep Stress of the Thick Concrete Liners with Big Diameters during the Construction in the TGP;
三峡工程大洞径、厚衬砌混凝土施工期监测及温度徐变应力研究