2) 2nd-stage upstream cofferdam of Three Georges Project
三峡工程二期上游围堰
3) TGP stageⅡ cofferdam
三峡二期围堰
1.
The paper has briefly analyzed the construction new techniques and result of the TGP stageⅡ cofferdam safety monitoring, through analysis we consider that 1.
对三峡二期围堰安全监测施工新技术和监测成果进行简要分析,通过分析认为1。
4) RCC cofferdam of TGP
三峡工程RCC围堰
1.
The demolition blasting of RCC cofferdam of TGP is carried out underwater 40 m depth;the analog test is done to examine the watertightness and the bond resistance of blast-hole stems;the details are described.
三峡工程RCC围堰拆除爆破是在水下40 m深处进行,为了验证炮孔封堵材料的密封性和粘着抗力而进行了模拟试验,对试验的细节加以介绍。
5) the stage III works (RCC Cofferdam project) of the Three Gorges Project
三峡Ⅲ期RCC围堰
6) Three Gorges Project Ⅱ stage construction
三峡二期工程
1.
The measures and equipments for temperature control in pouring concrete for Three Gorges Project Ⅱ stage construction are introduced and various factors affecting the pouring temperature are analysed in the paper.
介绍了三峡二期工程砼温度控制措施及设备 ,分析了影响砼浇筑温度的各种因素。