1) upstream cofferdam
上游围堰
1.
Application of controlled blasting in removal of upstream cofferdam;
控制爆破在上游围堰拆除中的应用
2.
Application of controlled blasting technology in removal of cut-off wall at TGP s upstream cofferdam;
控制爆破在三峡上游围堰防渗墙拆除中的应用
3.
The phase-Ⅱ upstream cofferdam at the Three Gorges project has a maximum height of 82.
三峡工程二期上游围堰最大高度 82 。
2) the 3rd RCC
三期上游围堰
3) downstream cofferdam
下游围堰
1.
The impervious wall in the downstream cofferdam of Dongping hydroproject is constructed by means of high-pressure Screw-Jetting, the slurry drilling methods is given up because the fine deposits in overburden layers are scoured away by water flow, and the PVC pipe is used to strengthen the drill hole and good effect is obtained.
洞坪水电枢纽工程下游围堰基础覆盖层受水流冲刷,细颗粒被带走,因此孔隙大、架空现象严重,高喷造孔泥浆固壁困难;施工时采用跟管钻进,造孔完成后下PVC管固壁获得成功。
4) 2nd-stage upstream cofferdam of Three Georges Project
三峡工程二期上游围堰
5) downstream RCC cofferdam
下游RCC围堰
1.
The concrete construction of downstream RCC cofferdam of Goupitan Hydropower Station has the feactures of short construction period, high intensity, and high quality requirement.
构皮滩水电站下游RCC围堰混凝土施工具有工期紧、强度大、施工质量要求高等特点。
补充资料:草土围堰
草土围堰
straw and earth cofferdam
连m)方法使用纪50峡等中修可成。。施土逐夭廉、沙河不超的底坡一乞,草牙、岩出比构的稳定围堰需随eaotu weiyan草土围堰(straw and earth eofferd利用麦草、稻草、柳枝和土为主要材料的传统施J构筑的临时挡水建筑物(见施工围堰)。中国广泛翅于黄河、淮河地区的灌溉工程和堵口工程中。20渔年代以后,这种传统施工方法又发展应用于青锈大型水利水电工程施工中。草土围堰可以在流沙筑,是用稻草、麦桔做成草捆、与土料混合堆筑}草捆直径0.5一0.7米,长1.8一2.咪,重约10千吏工中将草捆在水中铺成排,铺一层草捆,填一压渐向前沉放,它具有就地取材、施工简便、成本1结构上适应基础变形,防渗性能好,特别在多沂流上,可发挥其快速闭气的特点。它适用于水沂过5米、流速低于3.5米/秒的河流中。草土围堰宽约为堰高的2一3倍,按稳定要求核定,内外边般在1:0.25一1:0.5左右。每方土用草75一90千二土体的容重约1,1吨/米“,稳定计算时草与砂卵二石间的摩擦系数分别采用0.4和0.5,草土体的这降不宜大于0 .5。草土围堰的接头,尤其是软硬绍连接,至关重要。采用粘土心墙式的草土围堰转可靠,拆除时可在堰上开槽放水,水流很快可把冲走。草土围堰的缺点是沉陷量为堰高6一7%,时填补,且草料易于腐烂,寿命一般不超过2年 (葛文月
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条