1.
Finite Element Analyses of Schemes of Low and High Core Walls of Second Stage Cofferdam for Three Gorges Project
三峡工程二期围堰低高防渗心墙方案的有限元分析
2.
Comprehensive construction technology for the open channel clos ure and the third stage of earth-rock cofferdam at Three Gorges Project
三峡明渠截流与三期土石围堰工程综合施工技术
3.
Application of modified D-P model to analysis of the second stage cofferdam in Three Gorges Project
修正D-P模型在三峡二期围堰分析中的应用
4.
New Construction Techniques for Dam Foundation Grouting and Anti-seepage Cofferdam of Three Gorges Project
三峡工程坝基灌浆与围堰防渗施工新技术
5.
Research and application of some key technologies for the cofferdams of Three Gorges project
三峡工程围堰若干关键技术研究与实践
6.
Study on the Proposal of the Third Stage RCC Arch Cofferdam for Three Gorges Project;
三峡三期碾压混凝土拱围堰方案研究
7.
Hydration Heat Calculation of Fly Ash in RCC for 3rd Phase Cofferdam of Three Gorges Project
三峡三期围堰碾压混凝土中粉煤灰水化热计算研究
8.
Construction Design on Second-phase Cofferdam and River Closure of Tingzikou Water Control Project
亭子口水利枢纽二期围堰与大江截流施工设计
9.
PICC Property contracts the largest bid of the second phase of the Three Gorges Project
中保财险公司承保三峡二期工程最大标段
10.
Research on Technology of Underwater Blasting Compaction for TGP?s High Soil Rock Cofferdam
三峡高土石围堰水下爆炸压实技术研究
11.
The Electric Capacity Benefit of the Three Gorges Hydropower Stationat Water Storage Level 135 m in the Situation of Cofferdam;
三峡电站蓄水位135m围堰发电的容量效益
12.
Research on the Compensation of Concrete Crevice Treatment on the Upper & Down Stream Dam Surface of the Three Gorges Project;
三峡二期工程大坝上下游面混凝土裂缝处理变更补偿问题探析
13.
Influence of the Second Phase Water Level of the Three Gorges Dam Project upon the Tourism Development in Chongqing Reservoir Area;
长江三峡工程二期水位后对重庆库区旅游发展的影响及对策
14.
Temperature Control and Anti-crack Technique in the Construction of LOT II A of the Left Bank Plant Section of the Secondary Phase of the Three Gorges Project
三峡二期工程左岸厂房坝段ⅡA标段混凝土温控及防裂技术
15.
Construction of Bored Piles in Double wall Steel Cofferdam for the Second Changjiang River Bridge in Wuhan
武汉长江二桥双壁钢围堰钻孔桩施工
16.
Cofferdam design and construction for Xiangang reservoir reinforcement project
显岗水库加固工程围堰的设计与施工
17.
Study on Deformation Monitoring Model in Construction Period for Rock Mass of the Three Gorges Underground Powerstation;
三峡地下厂房围岩施工期变形监测模型研究
18.
Guide for design of cofferdam for hydropower and water conservancy project
水利水电工程围堰设计导则