说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三峡二期围堰
1.
Application of modified D-P model to analysis of the second stage cofferdam in Three Gorges Project
修正D-P模型在三峡二期围堰分析中的应用
2.
Study on the Proposal of the Third Stage RCC Arch Cofferdam for Three Gorges Project;
三峡三期碾压混凝土拱围堰方案研究
3.
Finite Element Analyses of Schemes of Low and High Core Walls of Second Stage Cofferdam for Three Gorges Project
三峡工程二期围堰低高防渗心墙方案的有限元分析
4.
Comprehensive construction technology for the open channel clos ure and the third stage of earth-rock cofferdam at Three Gorges Project
三峡明渠截流与三期土石围堰工程综合施工技术
5.
Hydration Heat Calculation of Fly Ash in RCC for 3rd Phase Cofferdam of Three Gorges Project
三峡三期围堰碾压混凝土中粉煤灰水化热计算研究
6.
Research on Technology of Underwater Blasting Compaction for TGP?s High Soil Rock Cofferdam
三峡高土石围堰水下爆炸压实技术研究
7.
The Electric Capacity Benefit of the Three Gorges Hydropower Stationat Water Storage Level 135 m in the Situation of Cofferdam;
三峡电站蓄水位135m围堰发电的容量效益
8.
Research and application of some key technologies for the cofferdams of Three Gorges project
三峡工程围堰若干关键技术研究与实践
9.
New Construction Techniques for Dam Foundation Grouting and Anti-seepage Cofferdam of Three Gorges Project
三峡工程坝基灌浆与围堰防渗施工新技术
10.
Construction Design on Second-phase Cofferdam and River Closure of Tingzikou Water Control Project
亭子口水利枢纽二期围堰与大江截流施工设计
11.
This paper introduces the research results on numerical stress strain analysis and centrifuge model test for the TGP? s high soil rock cofferdam.
介绍了应用数值分析和离心模型试验方法对三峡深水高土石围堰进行应力变形研究的成果。
12.
Study on Deformation Monitoring Model in Construction Period for Rock Mass of the Three Gorges Underground Powerstation;
三峡地下厂房围岩施工期变形监测模型研究
13.
Construction of Bored Piles in Double wall Steel Cofferdam for the Second Changjiang River Bridge in Wuhan
武汉长江二桥双壁钢围堰钻孔桩施工
14.
PICC Property contracts the largest bid of the second phase of the Three Gorges Project
中保财险公司承保三峡二期工程最大标段
15.
Three Dimensional Finite Element Analysis on Stress and Deformation of Cofferdam and Cut-off Walls of Shenxigou Hydropower Station
深溪沟水电站围堰堰体及防渗墙应力变形三维有限元分析
16.
Design and Application of Reinforced concrete Cofferdam on Baojixia Added Dam and Gate
宝鸡峡加坝加闸拱式钢筋混凝土倒挂壁围堰的设计与应用
17.
Analysis on Steel Cofferdam with Nonlinear Finite Element Method and Secondary Development of Marc;
钢围堰非线性有限元分析与Marc二次开发
18.
Application of high pressure jet grouted cut-off wall in powerhouse cofferdam of Erlongshan hydropower project
高喷防渗墙在二龙山水电站厂房围堰中的应用