说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 二期三期工程
1)  second and three stages projects
二期三期工程
2)  Three Gorges Project Ⅱ stage construction
三峡二期工程
1.
The measures and equipments for temperature control in pouring concrete for Three Gorges Project Ⅱ stage construction are introduced and various factors affecting the pouring temperature are analysed in the paper.
介绍了三峡二期工程砼温度控制措施及设备 ,分析了影响砼浇筑温度的各种因素。
3)  the second phase of the three gorges project
三峡工程二期
4)  phase Ⅲ engineering
三期工程
1.
Design feature of phase Ⅲ engineering in Dexing Copper Mine;
德兴铜矿三期工程的设计特点
5)  stage Ⅱ works
二期工程
1.
Dam concrete temperature control for TGP s stage Ⅱ works;
三峡二期工程大坝混凝土温度控制
2.
The construction of the stage Ⅰ works of TGP is briefly described and the major charateristics and difficulties of the stage Ⅱ works are presented.
对三峡一期工程的施工作了简要的回顾,并对二期工程施工的主要特点和难点进行了展望。
6)  second phase project
二期工程
1.
Application practice of multistage fan station ventilation system on the second phase project of Jilongshan gold mine;
多级机站通风系统在鸡笼山金矿二期工程的应用实践
2.
In order to reduce the pollution load discharged into coast, the second phase project of Yantai Xin an river wastewater treatment plant was carried out to improve the city s wastewater treatment rate.
为了提高城市污水处理率,减少向沿海排入的污染负荷量,烟台市辛安河污水厂进行了二期工程的实施。
补充资料:报告期
在对各时间的发展水平进行比较时,把所研究考察的那个时期称为报告期,相对应的发展水平称为报告期水平。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条