3) the Bund Bypass
外滩通道
1.
The EPB used in the Bund Bypass Project,Shanghai is the biggest diameter shield in domestic tunnel project.
本文针对上海外滩通道采用国内最大直径土压平衡盾构施工大断面、浅覆土、穿越保护建筑等特点,结合土压平衡盾构原理,介绍了超大直径土压盾构出洞段施工中所采用的关键风险技术控制措施,并总结了土压盾构出洞段施工风险控制的经验。
2.
The permissible settlement of ground surface and the permissible ground loss ratio are calculated, to ensure the buildings to be within safety requirement in conjunction with the Bund Bypass Project considered as applicable references to Peck formula during a safe tunneling by of Cosmopolitan Gallery of Architecture in the Bund.
本文基于预测盾构推进引起的地表横向变形的Peck公式,结合国内评价地表沉降对建筑物的影响的控制标准,对盾构推进引起邻近建筑物影响的评价标准进行了初步研究和探讨,并结合上海外滩通道工程计算了保证建筑物安全的容许地表沉降和地层损失率,为盾构安全穿越外滩万国建筑群提供了Peck公式应用的参考。
5) the phase one project of north bund central business district
北外滩CBD一期工程
1.
Located at the north of Huangpu River,the phase one project of north bund central business district is just between many world-famous Shanghai bund buildings built in the early twentieth century and new magnificent buildings such as the International Shipping Center and the bull wheel in Jinjiang Park.
北外滩CBD一期工程位于黄浦江北岸,空间上正好介于20世纪初外滩古典建筑群与即将建造的国际航运中心和摩天轮等尺度宏伟的21世纪新建筑之间,起着承前启后、承旧启新的作用。
6) Ertan Project
二滩工程
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条