1) Yantan project
岩滩工程
2) expansion project of Yantan Hydropower Station
岩滩水电站扩建工程
1.
It is determined that for the expansion project of Yantan Hydropower Station,surrounding rocks at the main powerhouse and the tailrace tunnel are ranked as grade II and grade III respectively.
主要力学参数可按无实测和有实测试验资料两种情况,选用本标准相对应的岩体力学参数和试验统计的折减值,经审核确定,岩滩水电站扩建工程围岩基本质量分级主厂房洞区为Ⅱ级,尾水洞区为Ⅲ级。
3) Ertan Project
二滩工程
4) Longtan Project
龙滩工程
1.
Based on the generalized analysis of the geological conditionst,est of rock mass stress and deformation monitoring of the test tunnel in the Longtan Project,the simplified geological model and the excavation model of the high antidip sandwich rock slope are set up.
在龙滩工程工程地质条件、地应力测试和试验洞变形监测结果综合分析的基础上,建立了地质概化和边坡施工开挖模型。
2.
The comprehensive assessment for enviramental impact of Longtan Project isStudied Systematically in this Paper,it analysizes the multiple-Step fuzzy evaluation method,and elaborates the gray anaalytic methad and so o
对龙滩工程环境影响进行了系统探讨,重点分析多级模糊综合评价法,并论述灰色分析综合评价等方法。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。