1) Longtan Project
龙滩工程
1.
Based on the generalized analysis of the geological conditionst,est of rock mass stress and deformation monitoring of the test tunnel in the Longtan Project,the simplified geological model and the excavation model of the high antidip sandwich rock slope are set up.
在龙滩工程工程地质条件、地应力测试和试验洞变形监测结果综合分析的基础上,建立了地质概化和边坡施工开挖模型。
2.
The comprehensive assessment for enviramental impact of Longtan Project isStudied Systematically in this Paper,it analysizes the multiple-Step fuzzy evaluation method,and elaborates the gray anaalytic methad and so o
对龙滩工程环境影响进行了系统探讨,重点分析多级模糊综合评价法,并论述灰色分析综合评价等方法。
3) Longtan Hydropower Project
龙滩水电工程
1.
An Overview on Layout and Utilization of Construction Equipment System for Longtan Hydropower Project;
龙滩水电工程施工设备系统布置与使用综述
2.
The inspection of monitoring capability of the digital telemetry seismograph network in Longtan Hydropower Project;
龙滩水电工程数字遥测地震台网监测能力检验
3.
In accordance with the characteristics of Longtan Hydropower Project, it has set up and perfected the planning manageme.
龙滩水电工程在建设过程中不断推行、探索和完善以项目法人负责制、建设监理制、招标投标制和合同管理制等为主要内容的工程建设管理模式,实行"小业主、大监理",根据龙滩工程特点,建立健全计划管理体制,投(融)资和工程造价管理体制、物流管理体制、工程质量和安全管理体制,实行封闭式管理,密切与地方的关系,狠抓现场文明施工,努力做到环境建设与工程建设同步推进,因而,在进度、质量、安全、文明施工、投资管理等方面成效显著。
5) Longtan Hydropower slope project
龙滩水电边坡工程
6) Ertan Project
二滩工程
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条