1.
Provisional supervision specification for telecommunications conduit & cable channel engineering
通信管道和电缆通道工程施工监理暂行规定
2.
Analysis of Accidents in Freezing Method Construction of Side Channel Project
冻结法施工地铁旁通道工程事故分析
3.
Horizontal Freezing Method Applied to By-pass in the Shanghai Underground Railway System;
水平冻结法在上海地铁隧道旁通道工程的应用
4.
On Geotechnical Investigation Key Points of Metro Tunnel's Bypass in Soft Soil Regions
软土地区地铁隧道联络通道工程勘察要点
5.
Technique of Theodolite for the Horizontal Ground Freezing Hole in Construction of Metro Bypass
隧道旁通道工程水平冻结孔经纬仪测斜技术
6.
Wuhan Urban Track Transporation Engineering Construction Technology Research;
武汉城市轨道交通工程施工技术研究
7.
Two PFMs are normally used on major pipeline projects.
大多数管道工程通常使用两个坡口机。
8.
Engineering Geological Conditions of Tunnel Passage (East Line) between Shanghai and Chong Ming
沪崇越江通道(东线)工程地质条件
9.
West-East Gas Pipeline Project Scheme Study For Yangtze River Crossing;
西气东输工程管道通过长江方案研究
10.
Construction Management Practice of Beijing-Tianjin Intercity Rail Transit Engineering;
京津城际轨道交通工程建设管理实践
11.
Organization Controlling Design in Rail Transit Project;
轨道交通工程项目总控组织设计研究
12.
On Project Management Mode in Tianjin-Binhai Rail Transit Line;
津滨快速轨道交通工程管理模式探索
13.
The Meaning and Application of Vehicular Speed in Road Traffic Project;
道路交通工程中的车速含义及其应用
14.
Exploration of design fees quotation for urban mass transit;
城市轨道交通工程设计费报价的探讨
15.
Method and Practice of Owner s WBS in Rail Transit Project;
轨道交通工程业主WBS方法与实践
16.
A Study on Metro Cost Control at the Design Phase;
轨道交通工程设计阶段投资控制分析
17.
Research on the Cost Control of Urban Railway Transit Project
城市轨道交通工程项目造价控制研究
18.
Design and Discussion on Holing Through Error of Urban Mass Transit
城市轨道交通工程隧道施工贯通误差测量精度设计与探讨