说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 北外滩CBD一期工程
1.
Architecture and City·History and Future--Scheme Design of the Phase One Project of North Bund Central Business District
建筑与城市·历史与未来——上海北外滩CBD一期工程方案设计
2.
Outside Beijing, several power plants will be built such as Wangtan Power Plant (phase I), Zhenglangi Power Plant (phase I) and Daihai Power Plant (phase I) in Inner Mongolia, and Xiahuayuan Power Plant (phase VI).
在北京境外建设王滩电厂一期、内蒙古正蓝电厂一期、内蒙古岱海电厂一期、下花园电厂六期工程。
3.
Inspirations of Foreign CBD Transportation Construction to Beijing CBD Transportation Construction;
国外CBD交通建设对北京CBD交通建设的启示
4.
Construction Technique for the Structural Works of Shanghai Bund Financial Center
上海外滩金融中心结构工程施工技术
5.
Water Pricing Research on the First Stage Project of the Western Route of the South-To-North Water Transfer;
南水北调西线一期工程水价初步研究
6.
The Analysis of Chinese Staffs Consumption Condition of Exercises in Beijing CBD;
对北京CBD中方员工健身消费现状的结构分析
7.
Numerical simulation of the current field near the bank protection project of the northern bank of Hangzhouwan Bay
杭州湾北岸保滩加固工程附近流场的数值模拟
8.
"Difficulty"and"New"in the Construction of the Shanghai Bund Access Reconstruction(South Section)Project
上海外滩通道改建工程(南段)施工中的“难”与“新”
9.
Structural Design of Working Shaft at Fuzhou Road of Shanghai Bund Passage Project
上海外滩通道工程福州路工作井结构设计实践
10.
Longtan Reservoir is a Greatest Flood Storage and Best Benefits Project in Guangxi
龙滩工程是广西防洪效益最好的一项工程
11.
Numerical Simulation of Planar 2D Flow of Chongqing Cuntan Phase Ⅲ Project
重庆寸滩三期工程平面二维水流数值模拟
12.
Preliminary Study on Silting Promotion Program for the Second Stage of the Qiantan Reclamation Project in Wenzhou Peninsula
温州半岛浅滩二期围涂工程促淤方案初步研究
13.
Analysis on Influence of Shield Crossing Suzhou River Flood Control Wall of the Bund Tunneling Project
外滩通道工程盾构穿越苏州河防汛墙影响分析
14.
Comparison and selection of correlation structure of No.1 lane of traffic hub project in the Bund
外滩交通枢纽工程1号车道相关结构的比选
15.
Enlightenment to Changsha from Domestic and Overseas CBD Communications Development
国内外CBD交通发展对长沙CBD的启示
16.
Study on Source Pump Station Optimal Operation of the First-stage Project of Eastern Route of South-to-North Water Transfer;
南水北调东线一期工程源头泵站优化运行研究
17.
Water Supply Cost Sharing and Calculating of the First Stage Project of the Eastern Route of the South-to-North Water Transfer;
南水北调东线第一期工程供水成本分摊与核算
18.
The Analysis and Survey on Current Status of Phase 1 of Sports for All Projects in Beijing;
对北京市全民健身一期工程的现状调查与分析