说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 立井内壁施工
1)  vertical shaft inner wall construction
立井内壁施工
2)  vertical shaft construction
立井施工
1.
This paper introduces the technology and application of synchronous concentrated control of several steady vehicles in vertical shaft construction, which has solved the dissynchromous consentrated control problem of steady vehicles and achieved great effect in vertical shaft construction.
本文介绍了立井施工中多台稳车同步集中控制技术及其应用,解决了稳车不能同步集中控制的问题,在立井井筒施工方面取得了良好的效果。
2.
Taking the vertical shaft construction of Qianfogou Coal Mine as the example, this paper introduces in detail the technology of slide template, and puts forward some matters needing attention in the construction.
以千佛沟矿排矸立井施工为例,详细介绍了滑动模板筑壁的工艺,提出了施工中的注意事项。
3)  shaft construction
立井施工
1.
This article illustrates the critical role of mechanical-electro management from the sides of new technology, smart equipment and management in shaft construction.
从使用新工艺、新设备 ,加强设备的维护管理等方面说明了机电管理在煤矿立井施工中的举足轻重作用 ,具有较大的指导作
2.
The risk of shaft construction is analyzed by using safety system engineering method.
本文以安全系统工程的方法分析立井施工中的风险,对危险源进行辩识和评价,找出立井施工期间安全控制的原则及所依据的理论,可为立井施工的安全管理提供参考。
3.
This paper introduces three methods in vehicle control during the shaft construction,and points out the usage and shortcomings of electronic control system consisting of a single,centralized control with multiple relays,buttons and other conventional electrical components.
本文介绍了立井施工中稳车控制的3种方法,指出了单台、多台集控以继电器、按钮等常规电器元件构成的电控系统在现场实践中的使用和其缺陷。
4)  deep standing well construction
深立井施工
1.
The paper introduces applied content and result in order to offer reference to deep standing well construction during drainage.
淄博矿业集团济北矿区唐口矿风井井筒深度1044m,在选择施工期间排水方案时,为了克服吊泵事故率高、维修不方便、投资大等缺点,改为吊盘上安装卧泵排水,取得了比较理想的效果,主要介绍了方案确定、具体实施内容及效果,可供处理大涌水量的深立井施工期间排水参考。
5)  shaft lining
立井井壁
1.
The problems of deformation for shaft lining are investigated under arbitrary axisymmetric normal loads and tangential loads with end loads.
对有限长立井井壁在任意轴对称的法向、切向以及端面荷载的共同作用下的变形问题作了分析研究。
2.
The fracture of shaft lining is a special type of engineering geologic disasters and is caused by interaction between mining and geological environment.
立井井壁破坏是一种特殊类型的工程地质灾害,是人类采矿活动和地质环境相互作用的结果。
6)  shaft wall
立井井壁
1.
Three-dimensional Numerical Simulation of Shaft Wall Temperature Stress;
立井井壁温度应力三维数值模拟分析
补充资料:槽壁法施工
在松软地层中建造地下连续墙的施工方法。从地面上沿预定墙身位置,使用专用机具(抓斗或钻孔机等)分段挖槽,槽内用泥浆护壁,借泥浆循环或机械方法出土。挖成6~8米一段深槽后,放入钢筋笼和接头模型,并在泥浆内应用导管浇灌混凝土。如此逐段进行挖槽筑壁便建成连续的钢筋混凝土墙,称为“地下连续墙”。常用于建造地下建筑工程的基坑挡土墙、工程结构的边墙和水利工程的大坝防渗墙等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条