2) shaft construction
井筒施工
1.
By the construction practice of pre-reserved beam sump in the shaft construction of Guqiao Coal Mine,goes further into the technical factors and pre-reserved result ect.
通过顾桥矿井筒施工过程中预留梁窝的施工实践,探讨了井筒掘砌中预留梁窝施工的技术因素、预留效果等。
3) silo construction
筒仓施工
4) tube structure construction
筒体施工
5) trench wall method
槽壁法施工
6) thin-walled cylindrical workpiece
薄壁圆筒工件
1.
By using axisymmetric thin-shell theory in plastic forming theories of metal, stresses are analyzed during the stamping-necking process of rotating ellipsoidal surface type in thin-walled cylindrical workpiece, and the relation is put forward between longitudinal stress in the necking section of such workpiece and other parameters when necking coefficient k≥0.
应用金属塑性成形理论中的轴对称薄壳理论 ,对薄壁圆筒工件旋转椭球面型冲压缩口成形过程的应力进行了分析 ,得出了缩口系数k≥ 0 71时此类工件缩口段经向应力的变化规律及其与其他参数之间的关系 ,推出了这种情况下工件最大轴向压应力及缩口力的计算公式 ,为工艺设计人员研究、制定相应缩口工艺提供了依据。
补充资料:槽壁法施工
在松软地层中建造地下连续墙的施工方法。从地面上沿预定墙身位置,使用专用机具(抓斗或钻孔机等)分段挖槽,槽内用泥浆护壁,借泥浆循环或机械方法出土。挖成6~8米一段深槽后,放入钢筋笼和接头模型,并在泥浆内应用导管浇灌混凝土。如此逐段进行挖槽筑壁便建成连续的钢筋混凝土墙,称为“地下连续墙”。常用于建造地下建筑工程的基坑挡土墙、工程结构的边墙和水利工程的大坝防渗墙等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条