您的位置:首页 -> 句库 -> 立井井壁
1.
Three-dimensional Numerical Simulation of Shaft Wall Temperature Stress;
立井井壁温度应力三维数值模拟分析
2.
Mechanical Mechanism and Design Theory of Shaft Lining Constructed in Subsidence Area;
塌陷区新型立井井壁结构与受力机理研究
3.
Damage form research of shaft sidewall under local load
局部荷载作用下立井井壁破坏形式研究
4.
Determination of shaft sidewall potential destruction region under multiple load and coupling action
多荷载耦合作用下立井井壁潜在破坏区的确定
5.
Research and design of shaft lining structure in mining subsidence area
采空塌陷区立井井壁结构的研究与设计
6.
Experiment Study on Interaction between Shaft Lining and Soil
煤矿立井井壁与围土相互作用的实验研究
7.
Raise construction for vertical coal bunker:technical practice in shaft wall water leakage prevention and control
立井煤仓反井施工及井壁防渗漏水技术的实践
8.
Study and Application of Grouting behind Main Shaft Wall to Ronghua Vertical Shaft
荣华立井主井井筒壁后注浆的研究与运用
9.
Shaft Slippery Mold Construction of Frosen Liner at Big Section with Deep Thick Surface Soil
大断面深厚表土层冻结立井井筒内层井壁滑模施工
10.
660m depthdrilling shaft lining structure design and analysis of main shaft Ban Ji mine
板集主井660m深钻井井壁结构设计分析
11.
Design Optimization of Drilled Shaft Lining Structure in 1000m Deep Shaft
千米深井钻井法凿井井壁结构设计优化
12.
Research on the Corresponding Relation between Secondary Ground Pressure Acting on Shaft and Water Table and Rupture Mechanism of Shaft Lining
立井次生地压与地下水位对应关系及井壁破裂机理研究
13.
Experience on the shrink shaft drilling construction reserve period
缩短立井井筒凿井施工准备期的经验
14.
Analysis of contact stress between thief zone wellbore and bellow pipe
油气井井漏井壁与波纹管接触应力分析
15.
A framework to support or strengthen a mine or shaft
井壁基架用来支承或加固矿井的构筑
16.
Study on Wellbore Stability Technique of Daqingzijing Area in Jilin Oil Field;
吉林大情字井地区井壁稳定技术研究
17.
The Method Research of Well-bore Stability Evaluation in Shale by Logging
泥页岩井壁稳定性测井评价方法探讨
18.
Study on Vertical Structural Stability of a Super-deep Drilled Shaft in Slurry
泥浆中超深钻井井壁竖向稳定性分析