1.
The Analysis of Construction Management and Key Links of Thousandmeters Large-diameter Deep Vertical Shaft
千米大直径深立井施工管理及重点环节探析
2.
Exploration on Application of Safe and Quick Construction Technology to Large Diameter Deep Shaft
大直径深立井安全快速施工技术探讨
3.
Freezing Construction Technology of Whole Bedrock in 548meters Deep Shaft
548米深立井全基岩冻结施工技术
4.
The Simple Discussion on the Safe Construction of Deep Thick Swelling Clay Layer of Vertical Shaft
浅谈立井井筒深厚冻结膨胀粘土层的安全施工
5.
Discussion on full face pull construction technology of the deep mine shaft drilling method
深立井钻井法全断面一次钻进施工技术的探讨
6.
Quick Construction Technology of Big Section Deep Shaft with Freezing Surface Soil
大断面深立井井筒冻结表土段快速施工技术
7.
Shaft Slippery Mold Construction of Frosen Liner at Big Section with Deep Thick Surface Soil
大断面深厚表土层冻结立井井筒内层井壁滑模施工
8.
Big Mouth Well Point Precipitation Construction Method
城市深基坑大口井井点降水施工工法
9.
Experience on the shrink shaft drilling construction reserve period
缩短立井井筒凿井施工准备期的经验
10.
Desigh of Centralized Control System of Sinking Hoist in Shaft Construction
立井施工凿井绞车集中控制系统设计
11.
Rapid Construction Methods of Welling 148m Monthly in Vertical Shaft in Dongtong
东同立井月成井148m快速施工方法
12.
Discussion on Working Platform Arrangement Pattern in Vertical Shaft Construction
立井井筒装备施工吊盘布置方式探讨
13.
Vertical Shaft Aquifer Surface Advance Grouting Engineering Technique
立井井筒含水层地面预注浆施工技术
14.
Anti-Well Construction Technology of Large And Medium Iron Mixed Shaft Extension Project
大中铁矿混合井延深工程反井施工技术
15.
The ConstructionAnalysis of Anti-Well Method Through Falling Soft Rock Section
反井法施工立井井筒过软岩垮落段实践分析
16.
Raise construction for vertical coal bunker:technical practice in shaft wall water leakage prevention and control
立井煤仓反井施工及井壁防渗漏水技术的实践
17.
The Construction Program of Exposing Deep Seam of in Main Shaft Coal of HU Jia-River Mine
胡家河煤矿主井井筒揭露深厚煤层施工方案
18.
Deep Alluvium Mine Shaft Drilling Construction Method
深厚冲积层煤矿井筒钻井法施工的探讨