1.
Desigh of Centralized Control System of Sinking Hoist in Shaft Construction
立井施工凿井绞车集中控制系统设计
2.
This paper in detail presented the transition of shaft sinking equipment for drift excavation in Wangershan Gold Mine.
介绍了在山东省望儿山金矿立井施工中,利用立井凿井设施进行平巷施工的改装方法。
3.
Water Inrush Prevention in Vertical Shaft Construction under Special Water Bearing Condition
特殊赋水条件下立井施工防治水技术
4.
Experience on the shrink shaft drilling construction reserve period
缩短立井井筒凿井施工准备期的经验
5.
Rapid Construction Methods of Welling 148m Monthly in Vertical Shaft in Dongtong
东同立井月成井148m快速施工方法
6.
Discussion on Working Platform Arrangement Pattern in Vertical Shaft Construction
立井井筒装备施工吊盘布置方式探讨
7.
Vertical Shaft Aquifer Surface Advance Grouting Engineering Technique
立井井筒含水层地面预注浆施工技术
8.
The ConstructionAnalysis of Anti-Well Method Through Falling Soft Rock Section
反井法施工立井井筒过软岩垮落段实践分析
9.
Raise construction for vertical coal bunker:technical practice in shaft wall water leakage prevention and control
立井煤仓反井施工及井壁防渗漏水技术的实践
10.
New Ideas and Construction Practice Concerning Air Shaft Material in the Compressible Layer
立井井筒可缩层选材的新思路与施工实践
11.
Increasing Blasting Efficiency of Frozen Rock and Speedingup Shaft Construction
提高冻结基岩爆破效率 加快立井井筒施工速度
12.
The Simple Discussion on the Safe Construction of Deep Thick Swelling Clay Layer of Vertical Shaft
浅谈立井井筒深厚冻结膨胀粘土层的安全施工
13.
Discussion on full face pull construction technology of the deep mine shaft drilling method
深立井钻井法全断面一次钻进施工技术的探讨
14.
On Construction Technology of Shaft Steel Frame of Wangfenggang Shaft in No.1 Xiejiaji Coal Mine
谢一矿望峰岗主井钢结构立井套架的施工技术
15.
Quick Construction Technology of Big Section Deep Shaft with Freezing Surface Soil
大断面深立井井筒冻结表土段快速施工技术
16.
Construction Practice on Rapid Driving through Silt Layer in Large-bore Vertical Shaft
大断面立井井筒快速通过砂土层的施工实践
17.
New construction technology of setting large steel-structure shaft frame during shaft sinking
凿井期间起立大型钢结构井架施工新技术
18.
The Construction Technology of the Frozen Air Shaft with Huge-Thick Soil and Major Diameter
巨厚表土层大直径立井井筒冻结法施工技术