1) Test run
开工调试
2) Start-up
开工
1.
Predictions Catalytic Distillation Column Start-up Processes Via Artificial Neural Network;
用人工神经网络预测催化精馏塔开工过程的研究
2.
The start-up scheme of JN60-6 type large-volume coke oven in Benxi Iron & Steel Group Co.
介绍了本溪钢铁公司JN60-6型大容积焦炉的开工方案,详述了焦炉改为正常加热、装煤、接通集气管等操作。
3.
The process design,start-up,commissioning and other circumstances were mainly introduced for Zhongxian Natural Gas Purification Plant in this paper,The features and the related problems of the plant were evaluated,and a few suggestions were proposed for design and commissioning of the gas purification plant.
主要对忠县天然气净化厂的开工试运、工艺设计等情况进行了介绍,对装置特点及存在问题进行了工艺评价,并对天然气净化厂在设计、试运中应注意的问题提出了一些看法。
3) start up
开工
1.
The result of pilot plant test in a 60 L commercial unit shows that the catalyst has a short start up time and there is no exothermic phenomenon during the starting up process.
器外预硫化催化剂工业放大和在60L装置上的试验结果表明,该种催化剂的开工时间短、开工过程无集中放热现象。
2.
A new method for sulfuric acid alkylation unit start up has been successfully adopted under the condition of inadequate iso butane concentration, so the requirement on iso butane purity for sulfuric acid alkylation unit start up has been greatly reduced and the unit has been smoothly started up.
在开工用异丁烷纯度不足的情况下,运用比较启发思维法,提出和应用新的开工方法,大幅度降低了对开工异丁烷纯度的要求,实现了硫酸法烷基化装置的顺利开工。
3.
Techno-economical analysis and comparison of oxidation catalyst and sulfurization catalyst have been carried out based on the process technology and practical start up of two catalytic reforming units.
结合两套催化重整装置工艺技术和实际开工情况 ,对氧化态和硫化态两种形态催化剂进行了技术经济综合分析和对比 ,探讨了进一步改进硫化态催化剂经济性的可能性。
4) startup
开工
1.
Improvements in Safe Startup of FCC Plants;
催化裂化开工的安全技术改进
2.
Presents the startup,operation and calibration results of twice full load operation of the newly-built 1.
4 Mt/a加氢裂化装置的开工、运行情况以及装置两次满负荷的标定结果。
3.
The result of its application in the first startup showed that, this new method i.
8Mt/aRFCC装置针对以往同类装置开工初期反应压力控制存在的诸多弊端,大胆提出了全新的控制方案:引再吸收塔油气至分馏塔充压,用DN600mm和DN200mm两种火炬阀配合节流控制反应压力,并应用在首次开工过程。
5) on stream
开工
6) Start-up and stopping
停开工
参考词条
补充资料:发包人要求承包人按时开工和按要求施工的权利
发包人要求承包人按时开工和按要求施工的权利:承包人应当按照合同的约定做好开工前的准备工作,负责作好施工场地的平整,施工界区内用水、用电、道路、以及临时设施的施工:编制施工组织设计或施工方案;按照约定作好材料和设备的采购、供应和管理;向发包人提供应由发包人供应的材料、设备的计划,承包人应按照合同约定的开工日期按时开工。在施工中,承包人须严格按照施工图及说明书进行施工,承包人不按照施工图和说明书施工而造成工程质量不符合合同约定条件的,应当负责无偿修理或者返工。《民法》第一版 第515页 魏振瀛 北京大学出版社
说明:补充资料仅用于学习参考,请勿用于其它任何用途。