1) on-stream period
开工周期
1.
The requirementsand its significances of prolonging the on-stream period,proposed bythe leader of SINOPEC,are emphasised.
介绍了中国石化总公司主要生产装置实现延长开工周期的情况,强调了总公司领导对延长开工周期的要求及其重大意义;着重就延长开工周期16条要点进行了论述和分析。
2) intermittent pumping cycle
间开周期
1.
Two liquid level build - up curves are used to determine the rational intermittent pumping cycle.
为了提高经济效益,采用间歇抽油生产方式,利用两种液面恢复曲线确定了合理的间开周期,应用效果较好,在同类油田中具有推广价值。
3) Working period
开动周期
4) cycle by cycle
开关周期
1.
Simulation and analysis based on the cycle by cycle switch average model;
基于开关周期平均模型的仿真分析
5) development cycle
开发周期
1.
Study on Supply Chain Management of New Product Development of Industrial Enterprises(3) ——Relationship between development expenses and development cycle for new products;
工业企业新产品开发供应链管理研究(3)——新产品开发费用与开发周期关系
2.
Integrated exercises in our practice of product design,we can shorten our product development cycle effectively,improve product quality,Increase the core competitive strength for the enterprise.
在产品开发实践中,综合运用这些技术,有效地缩短了产品的开发周期,提高了产品的质量,增强了企业的竞争力。
3.
This article mainly holds that during the development process of instrument panel(IP),it is essential to collaborate with each department at different time node to shorten development cycle and avoid some repetitive work.
文章主要讨论在仪表板开发过程中,在各个时间节点开展的设计工作应与各个部门配合完成相应交付物,以便缩短开发周期,避免重复工作。
6) construction period
施工周期
补充资料:发包人要求承包人按时开工和按要求施工的权利
发包人要求承包人按时开工和按要求施工的权利:承包人应当按照合同的约定做好开工前的准备工作,负责作好施工场地的平整,施工界区内用水、用电、道路、以及临时设施的施工:编制施工组织设计或施工方案;按照约定作好材料和设备的采购、供应和管理;向发包人提供应由发包人供应的材料、设备的计划,承包人应按照合同约定的开工日期按时开工。在施工中,承包人须严格按照施工图及说明书进行施工,承包人不按照施工图和说明书施工而造成工程质量不符合合同约定条件的,应当负责无偿修理或者返工。《民法》第一版 第515页 魏振瀛 北京大学出版社
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条