说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 开工条件
1)  project commencing requirement
开工条件
1.
The evaluation of supervision work in preparation phase of construction is mainly from the view of the supervision organization and project commencing requirement.
施工前的监理工作评价主要从监理组织机构、开工条件两个评价项目入手 ,就其包含的评价要素进行评价 ,利用这种评价方法针对监理单位某一建设项目的施工前的监理工作进行客观、综合的评价 ,对监理单位的工作可进行有效监督 ,提高监理质
2)  mining condition
开采条件
1.
Through analysing the geologic condition and deposit formation,scientific and reasonable selection first mining section in the process of second phase enlarging constructing design and achieving mining fill equilibrium in the process of mine production are put forward on the basis of the mining condition of Zhangmatun Iron Mine.
文章分析了张马屯铁矿的水文地质条件和矿体形态,根据矿床开采条件提出了二期扩建工程设计中应科学合理地选择首采地段,并努力实现矿山生产的采充平
2.
The mining condition in underground mine is an important factor to design and produce.
矿井开采条件是影响煤矿设计和生产的重要因素,它是一个由多个子因素组成的综合指标。
3.
Based on the variable fuzzy collection theory,a new safety evaluation model of the mining conditions in the mine,a fuzzy identification model,was established.
以可变模糊集理论为基础,建立一种新的煤矿开采条件安全评价模型——模糊可辨识模型,详细论述了模型建模过程。
3)  development condition
开发条件
1.
Qualiative and quantitative evaluation on tourist resources and development condition in Wansheng district, Chongqing;
重庆市万盛区旅游资源的开发条件及定量评价
2.
Based on features of geological structure, hydrogeology, stratigraphy and lithology, coal rank and quality, coal seam (seam group) thickness and parting distribution, the paper allsidedly analyzed the coal seam underground gasification development condition and prospect.
根据万全煤田地质构造、水文地质、地层岩性、煤类与煤质、煤层(组)厚度与夹矸的具体分布特点,对万全煤田煤层地下气化开发条件及其前景进行了较为全面的分析和研究,对今后本区煤炭资源开发利用具有一定的指导意义。
3.
It analyses the development conditions of Xiamen s tourism resources,and concludes that establishing the information system will improve the Xiamen s image,and it can bring about a further advance in Xiamen s tourism to expand the exploitation of social tourism resources and strengthen the regional cooperation.
以国家标准(GB/T18972-2003)进行旅游资源普查所获得的资料为依据,从旅游资源的构成类型、质量和空间分布对厦门市旅游资源进行了评价,分析了厦门市旅游资源的开发条件,指出建立旅游资源信息系统,提升城市旅游形象,加大对社会旅游资源的开发利用以及加强区域合作可以促进厦门市旅游业的进一步发展。
4)  cracking condition
开裂条件
1.
In order to study fracture property of RCC and cracking condition of induced joint,three point banding beam fracture tests of RCC have been carried out in this paper.
为了研究碾压混凝土的断裂特性和诱导缝的开裂条件,对多组碾压混凝土试件进行3点弯曲梁断裂试验,获得了碾压混凝土的抗拉、抗压强度,断裂韧度和断裂能,以及荷载-加载点挠度曲线、荷载-缝端开度曲线。
5)  open conditions
开放条件
1.
A study on the optimal ratio of state-owned stock in SOEs reform under open conditions;
开放条件下国企改革中国有股份最优比重问题研究
2.
In the future,the security problem of Chinese petroleum must be solved under open conditions with the aid of international petroleum market.
未来中国石油安全问题必须在开放条件下借助国际石油市场解决。
6)  compressor start up condition
开机条件
补充资料:发包人要求承包人按时开工和按要求施工的权利
发包人要求承包人按时开工和按要求施工的权利:承包人应当按照合同的约定做好开工前的准备工作,负责作好施工场地的平整,施工界区内用水、用电、道路、以及临时设施的施工:编制施工组织设计或施工方案;按照约定作好材料和设备的采购、供应和管理;向发包人提供应由发包人供应的材料、设备的计划,承包人应按照合同约定的开工日期按时开工。在施工中,承包人须严格按照施工图及说明书进行施工,承包人不按照施工图和说明书施工而造成工程质量不符合合同约定条件的,应当负责无偿修理或者返工。《民法》第一版 第515页 魏振瀛 北京大学出版社
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条