说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 立项开工
1)  project registration and beginning
立项开工
2)  new projects;newly started projects
新开工项目
3)  project selection
立项
1.
Taking scientific research fund project selection as the discussion object, analyse the existed problems in project selection during the current time according to the authors work experience.
 以我国某一基础研究资助部门的基金项目立项评估为讨论对象,根据自身工作的实际体验,分析了目前立项评估中存在的问题,包括:1专家判断映射失真;2不完全信息难以描述;3量化信息过于粗糙。
4)  establishment [英][ɪ'stæblɪʃmənt]  [美][ə'stæblɪʃmənt]
立项
1.
Study on the Comprehensive Evaluation Method of Establishment of Institutions Scientific Research Items;
高校科研项目立项综合评价研究
5)  project determination
立项
1.
This article introduced the measures and preliminary achievements of strengthening the construction of experimental teaching demonstration center of basic subjects in Shandong Normal University and expatiated on the importance of the construction of project determination.
介绍了加强基础课实验教学中心立项建设的做法和取得的初步成效,阐述了基础课实验教学示范中心立项建设的重要性。
6)  established projects
立项项目
补充资料:发包人要求承包人按时开工和按要求施工的权利
发包人要求承包人按时开工和按要求施工的权利:承包人应当按照合同的约定做好开工前的准备工作,负责作好施工场地的平整,施工界区内用水、用电、道路、以及临时设施的施工:编制施工组织设计或施工方案;按照约定作好材料和设备的采购、供应和管理;向发包人提供应由发包人供应的材料、设备的计划,承包人应按照合同约定的开工日期按时开工。在施工中,承包人须严格按照施工图及说明书进行施工,承包人不按照施工图和说明书施工而造成工程质量不符合合同约定条件的,应当负责无偿修理或者返工。《民法》第一版 第515页 魏振瀛 北京大学出版社
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条