说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 再开工
1)  restart-up
再开工
1.
There is big difference between restart-up sequence after emergency shutdown during operation of dehydrogenation reaction section in styrent unit and start-up sequence under complete cold conditions.
苯乙烯装置脱氢反应工段在运行期间由于某种意外发生紧急停车后,其再开工程序与完全冷态工况开工程序有较大差别。
2)  reopen [英][,ri:'əʊpən]  [美][ri'opən]
再开,再断开,再开始
3)  redevelopment [英][,ri:di'veləpmənt]  [美][,ridɪ'vɛləpmənt]
再开发
1.
Method and Typology of Redevelopment of Modern Japanese University Campus;
日本近代大学校园再开发方法及类型简析
2.
Urban waterfront redevelopment and space environment design;
浅析城市滨水区的再开发与空间环境设计
3.
A review of sustainability assessment for derelict land redevelopment;
工业废弃地再开发的可持续性评价方法回顾
4)  resuming of NC program
程序再开
1.
Then, the function of resuming of NC program is amended and amplified,and it can be used well in the workshop.
并在此基础上,对“程序再开”功能做了修正和完善,使该技术能真正的应用于现场。
5)  re-development
再开发
1.
The significance of teachers re-development of history textbooks lies not only in concretizing history curriculum contents and in adapting history textbook contents to students,but also in promoting teachers professional development.
教师对历史教材“再开发”,不仅是使历史课程内容具体化的过程,也是使历史教材内容适应学生的过程,同时还是教师专业成长的过程。
6)  rethoracotomy
再开胸
1.
Objective:To explore the type,morbidity and risk factors of postoperative complication following lung surgery which require rethoracotomy.
目的 :探讨肺手术后需再开胸处理的并发症的种类、发生率以及相关风险致病因素。
补充资料:发包人要求承包人按时开工和按要求施工的权利
发包人要求承包人按时开工和按要求施工的权利:承包人应当按照合同的约定做好开工前的准备工作,负责作好施工场地的平整,施工界区内用水、用电、道路、以及临时设施的施工:编制施工组织设计或施工方案;按照约定作好材料和设备的采购、供应和管理;向发包人提供应由发包人供应的材料、设备的计划,承包人应按照合同约定的开工日期按时开工。在施工中,承包人须严格按照施工图及说明书进行施工,承包人不按照施工图和说明书施工而造成工程质量不符合合同约定条件的,应当负责无偿修理或者返工。《民法》第一版 第515页 魏振瀛 北京大学出版社
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条