1) the Ironworks of Linfen Steel Limited Company
临钢炼铁厂
1.
Transformation of D1170- 2.856/0.989 Fan of the Ironworks of Linfen Steel Limited Company for Yield Increase and Energy Conservation;
临钢炼铁厂D1170-2.856/089风机增产节能改造
3) WISCO Ironworks
武钢炼铁厂
1.
Based on the research project, the paper has studied the fact that safety cost of production of WISCO Ironworks, has founded cost of production index system that is safer than that of WISCO Ironworks, has brought safe cost of production into cost administrative system.
以该项目为依托,通过对武钢炼铁厂安全成本进行分析研究,创立了较完善的武钢炼铁厂安全成本指标体系,将安全成本纳入成本管理体系。
4) coke oven plant associated with an iron works
钢铁联合企业的炼焦厂
5) Blast furnace plant
炼铁厂
1.
Through implementing the cleaner production auditing to the blast furnace plant of a Iron&steel union cooperation,this article aggregates the experience and analyzes the problem of the cleaner production auditing for the blast furnace plant,it would accumulate the practical experience for the future cleaner production auditing and the daily management.
通过对某炼铁厂实施清洁生产审核工作,对钢铁联合企业炼铁厂实施清洁生产审核工作所取得的经验和发现问题进行总结和分析,为炼铁厂今后清洁生产审核和日常管理积累实践经验。
6) steelmaking workshop
炼钢厂
1.
Production mode optimization of a steelmaking workshop system;
炼钢厂系统生产模式优化
2.
The steelmaking workshop is an important subsystem of steel manufacturing process system, the complexity of production process and difficulty of process control are the most concentrated expression on the multidimensional mass flow control in steel manufacturing process.
炼钢厂系统是钢铁制造过程系统的一个重要子系统,其制造过程的复杂性、过程控制的艰巨性是钢铁制造过程多维物质流管制最集中的体现。
补充资料:高炉炼铁厂平面布置
高炉炼铁厂平面布置
blast furnace plant layout
gaolu Iiantieehang Pingmian buzhi高炉炼铁厂平面布置(blast furnace plantlayout)指各个构筑物、建筑物和各种线路在炼铁厂平面图上的布置。工厂布置与厂区地形和钢铁联合企业的总体布置有关。该布置的目的是要合理确定高炉,热风炉,原、燃料储运和上料,渣铁运输及处理,煤气除尘,燃料喷吹,铁水罐修理库,碾泥机室,环保等各种设施的位置。新建炼铁厂的布置,厂区办公室及各种值班室的位置不应设在全年主导风向的下风侧。厂区内建、构筑物、管线至铁路、道路的限界尺寸应符合中国国家及行业标准规定。 平面布置要求高炉炼铁厂平面布置一般要求 为:(1)在工艺流程合理、操作安全、满足 生产要求的条件下,应尽可能布置紧凑, 以缩短各种管线及运输线长度。(2)厂内 铁路、道路布置要尽量减少互相干扰,保 证原、燃料、辅助材料及时供应,渣铁、 碎焦、碎矿、炉尘等及时运出。(3)在进 行厂区平面布置的同时,须统于考虑竖 向布置,且应充分利用自然地形,以减少 土石方工程量。同一货流的各条铁路线 应配置在同一标高上。必要时应因地制 宜,在垂直于高炉列线的方向上,即贮矿槽、高炉等区段允许有不同的标高。(4)厂内布置应考虑以后发展和采用新技术,适当留有余地,以及新室、大修或改扩建高炉时,施工机械的安装、作业和设备材料的运输等不致影响其他高炉的生产,要有堆放设备、材料和拆除物的场地。水渣也要根据运输工具考虑倒运场地。 平面布置形式大体有以下几种: (1)一列式布置(图1)。高炉与热风炉中心线在同一列线上,出铁场也布置在高炉列线上,炼铁厂运输线路与高炉列线平行。按这种方式布置,高炉间距大,炼铁厂跨度较小。 (2)并列式布置(图2)。高炉与热风护分设在两列线上,出铁场布置在高炉列线上,而炼铁厂铁路线与高炉列线平行。按这种方式布置,炼铁厂长度较短而跨度较大,热风管较长,新建高炉很少采用。 (3)半岛式布置。热风炉、高炉列线与渣铁运偷线成一角度,每座高炉有单独的尽头渣、铁罐停放蔫黔 图1 2x3。。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条