1.
The Iron Flower Blooming in Wumeng Mountain--The Investigation On the Smelting Iron Factory of Shuicheng Steel Ltd.Carrying Out the Important Thought“Three Representations”;
乌蒙山中铁花飞——水钢炼铁厂贯彻落实“三个代表”重要思想的情况调查
2.
Study on Process Optimization of Hot Metal Pre-treatment in CISC;
重钢炼钢厂铁水预处理工艺优化研究
3.
A Neural Network Model Predicting the Silicon Content in Hot Metal at No.3 Blast Furnace of No.2 Ironworks TangShan Iron and Steel Co.;
唐钢二炼铁厂3号高炉铁水硅含量神经网络预报模型
4.
Prediction Model of Molten Steel Temperature in 300t Ladle about the First Steel Mill in Shanghai Baoshan Iron & Steel Corporation;
宝钢—炼钢厂300t钢包钢水温度预报模型
5.
The steel mill contracted for ten million tons of iron ore.
炼钢厂立约订购1000 万吨铁矿。
6.
Technical Transformation of the Electric Dust Removal System at the Head of the Sinter Machine in Iron Making Plant of BX Steel
本钢炼铁厂烧结机头电除尘技术改造
7.
Producing Practice of 150 m~2 Sinter Machine in Hangzhou I & S CO
杭钢炼铁厂150m~2烧结机达产实践
8.
Comprehensive Reconstruction of 265m~2 Sinter Machine in Benxisteel
本钢炼铁厂265m~2烧结机综合改造
9.
Application of BG-Ⅲ Bell-less Top in the Iron-making Plant of Baotou Steel
包钢炼铁厂BG-Ⅲ型无料钟炉顶的应用
10.
Rebuild Main Workshop Building for 180m~2 Sintering Machine of No.1 Sintering Workshop in Iron-making Plant
包钢炼铁厂一烧车间180m~2烧结机主厂房改造
11.
Fracture Failure Analysis of Ladle Car Wheel in AISC No.1 Steelmaking Plant
鞍钢第一炼钢厂钢水渡车车轮断裂失效分析
12.
THE RESEARCH ON STABILIZING THE MUDDY RECYCLED WATER QUALITY OF BOF
攀钢炼钢厂提钒转炉浊环水水质稳定研究
13.
a gasworks, ironworks
煤气厂、 钢铁厂.
14.
Research on Estimation Analysis and Development Countermeasure of Human Resources in AISC Ironmaking Plant
鞍钢炼铁厂人力资源测评分析及开发对策研究
15.
STRUCTURE OPTIMIZATION OF STEEL WORKS MAY PROMOTE TECHNICAL ADVANCEMENT OF IRONMAKING
立足钢厂结构的优化搞好炼铁系统的科技进步
16.
Reformation Practice of “Three Change Two” Blast Furnace in No.1 Iron Making General Plant Of Maanshan Iron & Steel CO. Ltd;
马钢第一炼铁总厂“三改二”高炉改造实践
17.
Analysis and Prediction Optimal Model of Safety Investment in Ironworks of WISCO
武钢炼铁厂安全投入分析与预测优化模型
18.
Blast Furnace Cast House Equipment for the Realization of Automatic Control in Wuhan Iron and Steel Corporation
武钢炼铁厂高炉炉前设备自动控制的实现