1.
Analysis and Prediction Optimal Model of Safety Investment in Ironworks of WISCO
武钢炼铁厂安全投入分析与预测优化模型
2.
Blast Furnace Cast House Equipment for the Realization of Automatic Control in Wuhan Iron and Steel Corporation
武钢炼铁厂高炉炉前设备自动控制的实现
3.
Practice of steelmaking with minus energy in No.3 Steelmaking Plant of WISCO
武钢炼钢总厂三分厂转炉负能炼钢实践
4.
Study on Process Optimization of Hot Metal Pre-treatment in CISC;
重钢炼钢厂铁水预处理工艺优化研究
5.
Analysis on hydraulic oscillating fault in continuous caster in No.3 Steelmaking Plant of WISCO
武钢炼钢总厂三分厂连铸机液压振动故障浅析
6.
He has been practicing martial art since child and has muscles of iron.
他从小习武,锻炼成一副钢筋铁骨。
7.
He has been practicing martial art since childhood and has muscles of iron.
他一直习武,锻炼成一副钢筋铁骨。
8.
Present status of CO_2 emission from ironmaking in WISCO and potential analysis of emisson reduction;
武钢炼铁CO_2排放现状及减排方向
9.
The steel mill contracted for ten million tons of iron ore.
炼钢厂立约订购1000 万吨铁矿。
10.
Technical Transformation of the Electric Dust Removal System at the Head of the Sinter Machine in Iron Making Plant of BX Steel
本钢炼铁厂烧结机头电除尘技术改造
11.
Producing Practice of 150 m~2 Sinter Machine in Hangzhou I & S CO
杭钢炼铁厂150m~2烧结机达产实践
12.
Comprehensive Reconstruction of 265m~2 Sinter Machine in Benxisteel
本钢炼铁厂265m~2烧结机综合改造
13.
Application of BG-Ⅲ Bell-less Top in the Iron-making Plant of Baotou Steel
包钢炼铁厂BG-Ⅲ型无料钟炉顶的应用
14.
OPERATION RESULTS AT WISCO NO. 3 STEELMAKING PLANT IN HALF A YEAR SINCE START-UP
武钢第三炼钢厂投产半年来的操作运行结果
15.
CCM Revamping Scheme and Technological Analysis of Wuhan I/S (Group) Co. Steel Plant No.2
武钢第二炼钢厂连铸机改造方案及其工艺分析
16.
Some experiences in implementing the system of safety responsibility in production at a making-steel works;
武钢炼钢厂落实安全生产责任制的几点经验
17.
Rebuild Main Workshop Building for 180m~2 Sintering Machine of No.1 Sintering Workshop in Iron-making Plant
包钢炼铁厂一烧车间180m~2烧结机主厂房改造
18.
a gasworks, ironworks
煤气厂、 钢铁厂.