说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 二滩电厂滑坡
1)  Ertan Powerplant landslide
二滩电厂滑坡
2)  Ertan Hydropower Plant
二滩电厂
1.
High Temperature Fault Analysis and Treatment for Industrial Gas System at Ertan Hydropower Plant;
二滩电厂工业用气系统高温故障分析与处理
3)  Xintan landslide
新滩滑坡
1.
Taking 1985 Xintan landslide as a case study,this paper uses the multi-temporal remote sensing images and elevation data and basic geological information,synthetically analyzes the environmental background and calamity effects of Xintan landslide.
以1985年新滩滑坡为例,利用多时相遥感影像和高程数据以及基础地质资料,综合分析了新滩滑坡的环境背景和灾害影响。
2.
According to the geologic background and the engineering geologic characteristics, the geologic model of Xintan landslide is established to analyze the relationship between its stability and its geologic environment in terms of finite element method.
根据新滩滑坡的地质背景和工程地质特征 ,建立了滑坡地质模型 ,运用有限元数值模拟方法对其稳定性与地质环境的关系进行了分析 ,并对影响因素作了比较 ,明确了其形成机理。
3.
Based on the general principle of DDA,discontinuous deformation analysis,and the engineering geologic characteristics of Xintan landslide,the numerical simulation is carried out by DDA on the movementprocess of Xintan landslide.
简要介绍了非连续变形分析的基本原理,分析了新滩滑坡的工程地质特征和发展变化特征,并用非连续变形分析的方法对该滑坡运动的全过程进行了数值模拟,明确了其时空变化规律。
4)  Xietan landslide
泄滩滑坡
1.
Field tests of saturated and unsaturated hydraulic parameters of gravelly soil in Xietan landslide;
泄滩滑坡碎块石土饱和与非饱和水力学参数的现场试验研究
2.
Unsaturated seepage analysis and back analysis of permeability coefficient for Xietan landslide in Three Gorges Reservoir area;
三峡库区泄滩滑坡非饱和渗流分析及渗透系数反演
3.
The Xietan landslide body can be regarded as an interbedded structure with three permeable layers (slope wash,landslide deposit deposit,and effected zone of the landslide) and two relatively impermeable layers (sliding zone and foundation rock),so it is important to consider the coupling action of seepage and stress in the slide to evaluate the stability of landslide.
泄滩滑坡坡体从水力学特性来看为3层透水性较强的岩层(坡积物、滑坡堆积物和滑坡影响带)和2层透水性较弱的岩层(滑带和基岩)构成的互层状结构。
5)  Tanping landslide
滩坪滑坡
6)  Ertan Hydropower Station
二滩水力发电厂
1.
Research on the AGC System of Computer Supervision and Control System of Ertan Hydropower Station;
二滩水力发电厂计算机AGC控制系统研究
补充资料:IGCC电厂(见整体煤气化联合循环电厂)


IGCC电厂(见整体煤气化联合循环电厂)
Aintegrated gasification combined cycle plant

  IGCC电厂bined eyele(integrated gasifieationConl一plant)见整体煤气化联合循环电厂。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条