1) Longtan Hydropower Plant
龙滩电厂
1.
Analysis on reform of transformer protection of 10 kV service power of Longtan Hydropower Plant
龙滩电厂厂用10kV变压器保护改造分析
2.
The principle of rotor single-point grounding protection is described;the verification and analysis of the action of rotor single-point grounding protection in Longtan Hydropower Plant and relevant maintenance measures are described.
阐述了发电机转子一点接地保护的原理及龙滩电厂发电机转子一点接地保护动作后的检查和处理。
2) Huanglongtan hydropower plant
黄龙滩水电厂
1.
According to the practical conditions and expected objectives, using the method of qualitative analysis, quantitative analysis and qualitative-quantitative analysis, the conventional model, optimized model and empirical model are drawn up to be the basis of choosing and assessing the flood control operating scheme of Huanglongtan hydropower plant.
针对黄龙滩水电厂洪水调度的具体情况 ,在指定的目标要求和内外环境下 ,运用定量、定性或两者相结合的方法 ,提出了常规调度、优化调度和自拟调度三种洪水调度模型 ,产生了相应的洪水调度方案。
4) Fengtan hydropower plant
凤滩电厂
1.
Through in-situ drilling, the strata lithology of the reservoir bank slope near dam at the Fengtan hydropower plant is introduced and landslide slip surface (zone) was determined, the terrain and geomorphic characteristic was also analyzed.
通过现场钻探揭示了凤滩电厂近坝库岸永顺镇溪边坡的地层岩性,确定了滑裂面(带),并对地形地貌特征进行了分析。
5) Ertan Hydropower Plant
二滩电厂
1.
High Temperature Fault Analysis and Treatment for Industrial Gas System at Ertan Hydropower Plant;
二滩电厂工业用气系统高温故障分析与处理
6) Longtan Underground powerhouse
龙滩地下厂房
补充资料:IGCC电厂(见整体煤气化联合循环电厂)
IGCC电厂(见整体煤气化联合循环电厂)
Aintegrated gasification combined cycle plant
IGCC电厂bined eyele(integrated gasifieationConl一plant)见整体煤气化联合循环电厂。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条