说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 凤滩电厂
1)  Fengtan hydropower plant
凤滩电厂
1.
Through in-situ drilling, the strata lithology of the reservoir bank slope near dam at the Fengtan hydropower plant is introduced and landslide slip surface (zone) was determined, the terrain and geomorphic characteristic was also analyzed.
通过现场钻探揭示了凤滩电厂近坝库岸永顺镇溪边坡的地层岩性,确定了滑裂面(带),并对地形地貌特征进行了分析。
2)  Fengtan Hydropower Plantd
凤滩水电厂
3)  Fengtan hydropower station
凤滩水电站
4)  Longtan Hydropower Plant
龙滩电厂
1.
Analysis on reform of transformer protection of 10 kV service power of Longtan Hydropower Plant
龙滩电厂厂用10kV变压器保护改造分析
2.
The principle of rotor single-point grounding protection is described;the verification and analysis of the action of rotor single-point grounding protection in Longtan Hydropower Plant and relevant maintenance measures are described.
阐述了发电机转子一点接地保护的原理及龙滩电厂发电机转子一点接地保护动作后的检查和处理。
5)  Ertan Hydropower Plant
二滩电厂
1.
High Temperature Fault Analysis and Treatment for Industrial Gas System at Ertan Hydropower Plant;
二滩电厂工业用气系统高温故障分析与处理
6)  Fenghuang hydropower plant
凤凰水电厂
1.
6 penstock during in modification work of Fenghuang hydropower plant.
在凤凰水电厂更新改造工程中 ,2、3、5、6号压力钢管的镇墩均出现不同程度的裂缝。
补充资料:凤滩坝
      世界最高的混凝土空腹重力拱坝。位于中国湖南省沅陵县境内酉水下游,坝址以上控制流域面积17500km2多年平均降雨量1415mm,多年平均径流量159亿m3。枢纽以发电为主,兼有防洪、航运、灌溉、过木等综合效益。电站装机四台,每台机组容量10万kW。水库总库容17.4亿m3,为季调节水库。工程于1970年10月开工,1980年建成。
  
  坝内厂房的布置方式,妥善解决了大坝泄洪和厂房布置的矛盾, 避免了地下厂房洞室的大量开挖。 坝高112.5m,采用有限元分析、 三向光弹试验等方法, 对空腹结构形式及坝体应力分布规律进行研究,取得了对空腹重力拱坝设计与施工较全面的认识。空腹坝段全长255.8m,空腹断面呈向上游倾斜的椭圆,最大空腹高度40.1m,宽度20.5m,空腹容积达18.4万m3。两岸坝段采用实体重力坝与岸坡相接。溢流坝布置在河床中部,有13个溢流孔,溢流前沿净宽182m,最大下泄流量达32600m3/s,是世界上拱坝经坝身泄洪量最大的工程。采用高低坎两层大差动挑流消能,6个双数孔为高坎,其余7个单数孔为低坎 (见彩图)。泄洪时高、低两股射流在空中碰撞,并使水流充分扩散及沿河床纵向分散,消能效果良好,解决了窄河谷大泄量泄洪布置的困难。坝址处呈U型河谷,坝基为前震旦纪板溪群沙岩,夹有少量板岩夹层,断层节理发育。在坝基软弱夹层处理中,使用可灌性好、毒性低的聚氨酯新配方灌浆,提高了软弱夹层岩石弹性模量。坝基化学灌浆量,居世界拱坝工程首位。放空底孔与过坝设施布置在右岸。过坝设施采用垂直斜面两级升船机,通过船只能力为50t级,单向年通过木材能力为10万m3
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条