说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 盐锅峡水电站
1)  Yanguoxia hydropower station
盐锅峡水电站
1.
Summary on dam safety management for Yanguoxia hydropower station;
盐锅峡水电站大坝安全管理综述
2)  Yanguoxia Hydropower Plant
盐锅峡水电厂
1.
On-line monitoring of turbine discharge of Yanguoxia Hydropower Plant;
盐锅峡水电厂水轮机流量在线监测
3)  Three Gorges Hydropower Station
三峡水电站
1.
Principles and Operation Condition of Reactive Power Regulation of Generating Units at Three Gorges Hydropower Station;
三峡水电站机组无功调节原理及其运行情况分析
2.
Measurement Analysis and Practice of Insulation of Generator Stator Windings on Three Gorges Hydropower Station;
三峡水电站发电机定子绕组绝缘测量分析与实践
3.
Analysis on Vibration Test in Site for Unit of Three Gorges Hydropower Station;
三峡水电站机组现场振动测试分析
4)  Three Gorges Hydropower Plant
三峡水电站
1.
Study on vibration safety of powerhouse under water level of 156 m for 15th unit of Three Gorges Hydropower Plant;
156m水位下三峡水电站15~#机组厂房结构的振动安全研究
2.
Research on the low-head operation stability of left-bank ALSTOM generator units of Three Gorges Hydropower Plant;
三峡水电站ALSTOM机组低水头运行稳定性分析
5)  Three Gorges Project
三峡水电站
1.
Dynamic Characteristics of Three Gorges Project and Features of Hydro-generator Sets;
简单介绍三峡水利枢纽工程,着重叙述三峡水电站的动能特性及水轮发电机组运行特点等。
6)  Xiakou Hydropower Plant
峡口水电站
补充资料:盐锅峡水电站

盐锅峡水电站

Yanguoxia Hydropower Station


概  述

  盐锅峡水电站位于中国甘肃省永靖县黄河干流盐锅峡出口处,距兰州市70km。工程以发电为主,兼有灌溉效益。设计灌溉面积0.3万hm2。混凝土宽缝重力坝,最大坝高55m,水库总库容2.79亿m3,水电站装机容量35.2万kW,年发电量22.8亿kW·h。
  1958年9月开工,1962年1月第一台机组发电。至1970年共有6台机组投产。7号和8号机组于1975年投产。
  坝址基岩以白垩系砂岩为主,夹有砂砾岩,粉砂岩及页岩。
  坝址以上流域面积18.28万km2,多年平均流量877m3/s,年径流量275亿m3,年输沙量7600万t。
  工程由主坝、厂房及灌溉引水管道组成。
  主坝全长321m,溢流段位于大坝右侧,设有4个12m×10m溢流孔。采用消力池水跃消能。大坝按200年一遇洪水设计,千年一遇洪水校核,最大洪峰流量7500m3/s。
  厂房位于大坝左侧坝后,装有单机容量4.4万kW水轮发电机组3台和4.5万kW机组6台,设计水头38m,蜗壳采用钢筋混凝土结构。保证出力13.9万kW。
  灌溉引水管设在大坝两端。
  主体工程量:土石方开挖109万m3,混凝土浇筑53.5万m3。工程截流采用立堵法,由左岸单向进占。工程投入运行后,曾出现漂浮物严重堵塞水电站进水口拦污栅的情况。