说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 盐锅峡
1)  Yanguoxia
盐锅峡
1.
The Erosive Destruction and Reconstruction of Aprons of the First Stage Stilling Basin in Yanguoxia Hydropower Station, Yellow River;
黄河盐锅峡水电站一级消力池护坦冲刷破坏及修复
2.
With fault diagnosis of turbine generator unit vibration as the research object,the expert system based on neural network and in combination with the real machine test on Yanguoxia hydropower plant is presented in this paper.
结合盐锅峡水电站5#水轮发电机组的真机试验研究,通过对试验数据的分析和诊断,结果表明用神经网络专家系统进行方法水轮发电机组振动故障诊断是可行和有效的。
2)  Yanguoxia Formation
盐锅峡组
3)  Yanguoxia dam
盐锅峡大坝
4)  Yanguoxia Hydropower Plant
盐锅峡水电厂
1.
On-line monitoring of turbine discharge of Yanguoxia Hydropower Plant;
盐锅峡水电厂水轮机流量在线监测
5)  Yanguoxia hydropower station
盐锅峡水电站
1.
Summary on dam safety management for Yanguoxia hydropower station;
盐锅峡水电站大坝安全管理综述
6)  salt industry in the Three Gorges area
三峡盐业
补充资料:盐锅峡水电站

盐锅峡水电站

Yanguoxia Hydropower Station


概  述

  盐锅峡水电站位于中国甘肃省永靖县黄河干流盐锅峡出口处,距兰州市70km。工程以发电为主,兼有灌溉效益。设计灌溉面积0.3万hm2。混凝土宽缝重力坝,最大坝高55m,水库总库容2.79亿m3,水电站装机容量35.2万kW,年发电量22.8亿kW·h。
  1958年9月开工,1962年1月第一台机组发电。至1970年共有6台机组投产。7号和8号机组于1975年投产。
  坝址基岩以白垩系砂岩为主,夹有砂砾岩,粉砂岩及页岩。
  坝址以上流域面积18.28万km2,多年平均流量877m3/s,年径流量275亿m3,年输沙量7600万t。
  工程由主坝、厂房及灌溉引水管道组成。
  主坝全长321m,溢流段位于大坝右侧,设有4个12m×10m溢流孔。采用消力池水跃消能。大坝按200年一遇洪水设计,千年一遇洪水校核,最大洪峰流量7500m3/s。
  厂房位于大坝左侧坝后,装有单机容量4.4万kW水轮发电机组3台和4.5万kW机组6台,设计水头38m,蜗壳采用钢筋混凝土结构。保证出力13.9万kW。
  灌溉引水管设在大坝两端。
  主体工程量:土石方开挖109万m3,混凝土浇筑53.5万m3。工程截流采用立堵法,由左岸单向进占。工程投入运行后,曾出现漂浮物严重堵塞水电站进水口拦污栅的情况。