1) Liujiaxia hydropower station
刘家峡水电站
1.
Repair technology on gate and slot of Liujiaxia hydropower station;
刘家峡水电站泄洪洞闸门及门槽的补强加固修复技术
2.
Primary Analysis of Impact of Liujiaxia Hydropower Station on Area Economy and Socity;
浅析刘家峡水电站对区域经济及社会的影响
3.
Basing on statistical analysis and combining with design,construction and operation data,the warning values of dam safety monitoring at Liujiaxia hydropower station were determined.
针对刘家峡水电站运行条件的改变,通过计算研究,以统计分析为主,同时综合分析设计、施工、运行的有关资料,按照保证安全、讲究实际、灵活方便的原则,最终确定大坝重要部位的监测物理量警戒值。
2) Liujiaxia Hydropower Plant
刘家峡水电厂
1.
Water loss calculation and check for Liujiaxia Hydropower Plant;
刘家峡水电厂空耗水量的计算及考核
2.
The Research of Rehabilitating and Enhancing for Hydroelectric Set in Liujiaxia Hydropower Plant;
刘家峡水电厂水轮发电机组增容改造分析研究
3.
The calculation of 2003 water loss in Liujiaxia hydropower plant indicates that the method is simple,rationable and feasible.
通过对刘家峡水电厂2003年空耗水量的计算,表明了该方法简单、合理、可行。
3) Liujiaxia reservoir
刘家峡水库
1.
Feasibility argumentation on the dynamical flood control limited water level of Liujiaxia reservoir in flood season;
刘家峡水库汛期动态防洪限制水位论证研究
2.
Regulation of Liujiaxia Reservoir in Ice-flood Control of Yellow River;
黄河防凌预案中的刘家峡水库调度
3.
Distribution of sediment diameter of bed load at the fluctuating backwater reach of Liujiaxia Reservoir;
刘家峡水库变动回水区河床质泥沙粒径分布
4) the Liujiaxia Reservoir
刘家峡水库
1.
Study on Calculation of Density Current Forecast of the Taohe River in the Liujiaxia Reservoir;
刘家峡水库洮河异重流预报计算研究
5) Lijiaxia Hydropower Station
李家峡水电站
1.
Research on the Causes and Frequency of the Vibration of Hydroelectric Generating Set in Lijiaxia Hydropower Station;
李家峡水电站机组振动原因及其频率初探
2.
Analysis on pendulum automatic observation data of Lijiaxia hydropower station;
李家峡水电站垂线自动化观测资料模型分析
3.
The Improvement on the Governor of Lijiaxia Hydropower Station No.4 Turbine Generating Unit;
李家峡水电站4号机组调速器的改进
6) Chaijiaxia
柴家峡水电站
1.
On river closure of Chaijiaxia hydropower project;
黄河柴家峡水电站施工截流思考
补充资料:刘家峡水电站
刘家峡水电站 黄河干流上以发电为主,兼有防洪、灌溉、防凌、航运、养殖等效益的大型水利枢纽。位于中国甘肃省永靖县境内,1974年建成。坝后及地下厂房安装22.5万千瓦机组3台;25万千瓦和30万千瓦机组各1台,总装机容量122.5万千瓦,年发电量55.8亿千瓦时。水库总容量57亿立方米,采用混凝土重力坝,最大坝高147米,长204米,顶宽16米。左右岸各有混凝土副坝和溢流堰连接。大坝总长840米。水库通过蓄洪补枯调节,可提高该电站及其下游的盐锅峡、八盘峡、青铜峡各级电站枯水期出力,改善甘肃、宁夏和内蒙等省(区)105万公顷农田灌溉条件。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条