1) Qinggangxia Hydroelectric Station
青岗峡水电站
1.
Application of Compound Geomembrane to Dam Face Anti-seepage in Qinggangxia Hydroelectric Station;
复合土工膜在青岗峡水电站坝前防渗中的应用
3) Qinggangxia hydropower project
青岗峡
1.
By survey control of the process of embankment fill for Qinggangxia hydropower project,it can accurately define its location and increase working efficiency in combination with programming calculator and full station,which has greater practical value.
通过对青岗峡水电站坝体填筑施工过程的测量控制,用编程计算器与全站仪的配合,可以准确其定位,提高工作效率,具有较强的实用价值。
4) Three Gorges Hydropower Station
三峡水电站
1.
Principles and Operation Condition of Reactive Power Regulation of Generating Units at Three Gorges Hydropower Station;
三峡水电站机组无功调节原理及其运行情况分析
2.
Measurement Analysis and Practice of Insulation of Generator Stator Windings on Three Gorges Hydropower Station;
三峡水电站发电机定子绕组绝缘测量分析与实践
3.
Analysis on Vibration Test in Site for Unit of Three Gorges Hydropower Station;
三峡水电站机组现场振动测试分析
5) Three Gorges Hydropower Plant
三峡水电站
1.
Study on vibration safety of powerhouse under water level of 156 m for 15th unit of Three Gorges Hydropower Plant;
156m水位下三峡水电站15~#机组厂房结构的振动安全研究
2.
Research on the low-head operation stability of left-bank ALSTOM generator units of Three Gorges Hydropower Plant;
三峡水电站ALSTOM机组低水头运行稳定性分析
6) Three Gorges Project
三峡水电站
1.
Dynamic Characteristics of Three Gorges Project and Features of Hydro-generator Sets;
简单介绍三峡水利枢纽工程,着重叙述三峡水电站的动能特性及水轮发电机组运行特点等。
补充资料:盐锅峡水电站
盐锅峡水电站 |
Yanguoxia Hydropower Station |
概 述 |
盐锅峡水电站位于中国甘肃省永靖县黄河干流盐锅峡出口处,距兰州市70km。工程以发电为主,兼有灌溉效益。设计灌溉面积0.3万hm2。混凝土宽缝重力坝,最大坝高55m,水库总库容2.79亿m3,水电站装机容量35.2万kW,年发电量22.8亿kW·h。 |