说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 三峡-葛洲坝梯级电站
1)  Three Gorges-Gazhouba Cascade Hydroelectric Projects
三峡-葛洲坝梯级电站
2)  Three Gorges Dam and Gezhouba Dam
三峡-葛洲坝
1.
Dimensionality Reduction Quickly Arranging Algorithm of Lock Chambers in Co-Scheduling of Three Gorges Dam and Gezhouba Dam System;
三峡-葛洲坝联合调度系统闸室编排快速算法
3)  Gezhouba hydropower station
葛洲坝电站
1.
The Summarize of Alteration and Capacity-Increasing in Gezhouba Hydropower Station;
葛洲坝电站机组增容改造综述
2.
The technical measures for capacity extension of 125 MW hydropower units of Gezhouba hydropower station are described.
介绍了葛洲坝电站125 MW水轮发电机组增容改造的技术措施。
3.
Model test indicated that in case the reverse regulation of Gezhouba Hydropower Station could be utilized,during TGP Hydropower Station regulating peak, all hydraulic indexes between two dams and downstream Gezhouba Project would satisfy the requirements for navigation.
水工模型试验研究表明 ,三峡电站汛期调峰时 ,运用葛洲坝电站进行反调节 ,两坝间和葛洲坝下游河段的水力指标可以满足航运要
4)  Three Georges Cascaded Hydropower Plant
三峡梯级水电站
1.
With the introduction to AGCs implementing principle and main control operation methods-frequency control and power control, this paper narrates what AGC should pay attention to according to the specific condition in Three Georges Cascaded Hydropower Plant.
并根据三峡梯级水电站具体情况阐述了AGC需要考虑之处。
5)  Gezhouba Hydropower Station
葛洲坝水电站
1.
Alteration of Runner Seal of the Large Kaplan Turbine of Gezhouba Hydropower Station;
葛洲坝水电站水轮机转轮密封改造
2.
Research of Anti-abrasion of Turbine's Blades of Gezhouba Hydropower Station
葛洲坝水电站水轮机叶片抗磨蚀的研究与防护
3.
Effect on DC Biasing on Main Transformers of Gezhouba Hydropower Station and Study on Restraining Measures;
从与直流系统的联结情况、长江巨大水体的影响等方面分析了葛洲坝水电站主变压器受直流偏磁影响的可能性,并从磁路结构对三相五柱式变压器的抗偏磁能力进行了论证。
6)  Gezhouba second Channel powerplant
葛洲坝二江电站
补充资料:葛洲坝—上海±500kV直流输电工程


葛洲坝—上海±500kV直流输电工程
Gezhouba-Shanghai±500k V Direct Current Transmission Project

葛洲坝一上海士SOOkv直流输电工程(Gezhouba一Shanghai士SOOkV Direet Cur-rent Transmission Project)中国第一个大容量、长距离超高压直流输电系统。其线路西起葛洲坝水电站的宋家坝变电所,东至华东电力系统上海市南桥换流站(见彩图插页31页)。线路全长1 046k。,输电电压土5。。kv,输送功率120方kw。线路由中国设计和施工,换流站设备由国外引进。线路第一极(极工) 逆变站(南桥)溉李渔思冷笋国┌──┬─┐┌─┬─┐│一艺│3 ││压│石│└──┴─┘└─┴─┘┌──┬─┐ │一艺│么│┌─┬─┐│ │ ││又│夕│└──┴─┘└─┴─┘┌──┬─┐ │乙 │飞│┌─┬─┐└──┴─┘│压│巨│ └─┴─┘┌──┬─┐ │乙 │玉│┌─┬─┐└──┴─┘│叮│己│ └─┴─┘ 葛一上线两端直流输电系统示意 1.6脉冲换流器2.换流变压器3.平波电抗器4.直流滤波器5.交流滤波器6.无功补偿电容器双极华东每侧双避工况系统V超地放类试哥)于扮89年5月调试,9月正式投人运行。极五希于199。年8月投运,葛一上线是华中电力系统泪电力系统间的强大联络线。线路采用拉线式铁塔支撑一极导线。导线采用4分裂导线束,塔顶采月雷线保护。当因故障或一侧停电检修时,单极运衣的输送功率为6。万kw。葛一上线两端直流输庄示意如图。 葛一上线调试过程中进行了中国首次士5001高压直流输电线路现场接地故障试验,强大的刘电电孤见彩图插页第32页。世界各国至今未见追验报道口〔林华咨朱家“
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条