1.
Research of Anti-abrasion of Turbine's Blades of Gezhouba Hydropower Station
葛洲坝水电站水轮机叶片抗磨蚀的研究与防护
2.
China Gezhouba Construction Group Corp.
中国葛洲坝水利水电工程集团公司
3.
Technical innovations of Gezhouba Group in construction of hydropower engineering
葛洲坝集团在水电施工中的技术创新
4.
Operation Stability of Gezhouba Hydropower Station after its Capacity Increasing
葛洲坝电站增容改造机组运行稳定性介绍
5.
Impact of daily regulation for hydropower station on navigation conditions of downstream side of Gezhouba project in dry season
电站日调节波对葛洲坝下游枯期通航条件影响
6.
Large-size bolts assembling and disassembling in hydroturbine maintenance of Gezhouba Hydropower Plant
葛洲坝电厂水轮机检修中的大型螺栓拆装
7.
Application of automatic control and measurement system in TGP-GP step power station model
三峡-葛洲坝梯级电站模型中自动控制及测量系统的应用
8.
The Key Technology Research of Unit increasing Capacity Rebuilding for GHPP and Project Management;
葛洲坝电站机组增容改造关键技术研究及工程项目管理
9.
The overhaul mode research and information management of two hydropower stations in Ge Zhou Ba-the Three Gorges;
葛洲坝和三峡电站检修模式研究及其检修信息管理
10.
Measurement and Analysis of Harmonic Wave about Gezhouba 500kV DC Converter Station;
葛洲坝500kV直流换流站谐波测试与分析
11.
Effects of Three Gorges and Gezhouba reservoirs on river water temperature regimes
三峡-葛洲坝梯级水库水温影响研究
12.
The Coordinate Flaw Solution of Gezhouba Hydropower Plant AGC and Primary Frequency Modulation
葛洲坝水电厂AGC调节与机组一次调频配合缺陷的解决方法
13.
Trial and Application of Primary Frequency Regulation Function for Hydro-turbine Generator Unit in GZB Hydropower Plant
一次调频功能在葛洲坝电厂水轮机组的试验与应用
14.
Application of Programmable Computer Controller in Reformation of Gezhouba Hydro-plant Governor
PCC可编程计算机控制器在葛洲坝水电厂调速器改造中的应用
15.
Methodology Study and Practices of Optimal Maintenance for Gezhouba Hydro Power Plant;
葛洲坝电厂最优维护方法研究与实践
16.
Realization of Primary Frequency Regulation for Generator Units in Gezhouba Hydropower Plant
葛洲坝电厂机组一次调频功能的实现
17.
Analysis of Energy Loss and Economic Operation for Main Transformer in Gezhouba Power Plant
葛洲坝电厂主变变损和经济运行分析
18.
dam - diversion type hydroelectric power station
坝-引水混合式水电站