1) Gezhouba Hydropower Plant
葛洲坝电厂
1.
Large-size bolts assembling and disassembling in hydroturbine maintenance of Gezhouba Hydropower Plant
葛洲坝电厂水轮机检修中的大型螺栓拆装
2.
Implementation of New Efficient Operation Management Mode in the Gezhouba Hydropower Plant
新型高效运行管理模式在葛洲坝电厂的实施
2) Erjiang power plant
葛洲坝二江电厂
1.
Discussion on and Implementation of Upgrading of Computer Supervisory Control System of the Erjiang power plant of Gezhouba Hydropower Station;
葛洲坝二江电厂监控系统升级改造的实施与探讨
3) Gezhouba Dajiang Hydropower Plant
葛洲坝大江电厂
1.
Review of the Development Course of Computer Monitoring System of Gezhouba Dajiang Hydropower Plant;
葛洲坝大江电厂计算机监控系统发展过程回眸
4) Gezhouba Power Plant
葛洲坝水电厂
1.
high-voltage circuit breakers of 500 kV were equipped in the Gezhouba Power Plant.
葛洲坝水电厂共装有 18台 5 0 0kV高压断路器 ,鉴于目前SF6断路器液压机构存在的问题 ,为使设备安全运行 ,提出将FA4 - 5 5 0型断路器液压机构换型为LW6断路器的液压机构。
2.
The technical water supply system of Gezhouba Power Plant has been troubled by the blockage of water filter.
葛洲坝水电厂的技术供水系统一直承受着滤水器堵塞的困扰 ,滤水器的堵塞带来了运行设备的频繁倒换、阀门磨损、加压水泵损坏等一系列问题。
3.
The hydro-generating units of Gezhouba Power Plant have some problems such as the burning of thrust bearing liner, the block of large bearing sealing, the shed-off of anti-abrasion blocks of control ring, the easy shearing of shear lock, etc.
葛洲坝水电厂水轮发电机组存在着推力瓦烧损 ,大轴密封发卡 ,控制环抗磨块脱落 ,剪断锁易剪断等问题。
5) gezhouba power station
葛洲坝水力发电厂
6) Gezhouba hydropower station
葛洲坝电站
1.
The Summarize of Alteration and Capacity-Increasing in Gezhouba Hydropower Station;
葛洲坝电站机组增容改造综述
2.
The technical measures for capacity extension of 125 MW hydropower units of Gezhouba hydropower station are described.
介绍了葛洲坝电站125 MW水轮发电机组增容改造的技术措施。
3.
Model test indicated that in case the reverse regulation of Gezhouba Hydropower Station could be utilized,during TGP Hydropower Station regulating peak, all hydraulic indexes between two dams and downstream Gezhouba Project would satisfy the requirements for navigation.
水工模型试验研究表明 ,三峡电站汛期调峰时 ,运用葛洲坝电站进行反调节 ,两坝间和葛洲坝下游河段的水力指标可以满足航运要
补充资料:葛洲坝—上海±500kV直流输电工程
葛洲坝—上海±500kV直流输电工程
Gezhouba-Shanghai±500k V Direct Current Transmission Project
葛洲坝一上海士SOOkv直流输电工程(Gezhouba一Shanghai士SOOkV Direet Cur-rent Transmission Project)中国第一个大容量、长距离超高压直流输电系统。其线路西起葛洲坝水电站的宋家坝变电所,东至华东电力系统上海市南桥换流站(见彩图插页31页)。线路全长1 046k。,输电电压土5。。kv,输送功率120方kw。线路由中国设计和施工,换流站设备由国外引进。线路第一极(极工) 逆变站(南桥)溉李渔思冷笋国┌──┬─┐┌─┬─┐│一艺│3 ││压│石│└──┴─┘└─┴─┘┌──┬─┐ │一艺│么│┌─┬─┐│ │ ││又│夕│└──┴─┘└─┴─┘┌──┬─┐ │乙 │飞│┌─┬─┐└──┴─┘│压│巨│ └─┴─┘┌──┬─┐ │乙 │玉│┌─┬─┐└──┴─┘│叮│己│ └─┴─┘ 葛一上线两端直流输电系统示意 1.6脉冲换流器2.换流变压器3.平波电抗器4.直流滤波器5.交流滤波器6.无功补偿电容器双极华东每侧双避工况系统V超地放类试哥)于扮89年5月调试,9月正式投人运行。极五希于199。年8月投运,葛一上线是华中电力系统泪电力系统间的强大联络线。线路采用拉线式铁塔支撑一极导线。导线采用4分裂导线束,塔顶采月雷线保护。当因故障或一侧停电检修时,单极运衣的输送功率为6。万kw。葛一上线两端直流输庄示意如图。 葛一上线调试过程中进行了中国首次士5001高压直流输电线路现场接地故障试验,强大的刘电电孤见彩图插页第32页。世界各国至今未见追验报道口〔林华咨朱家“
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条