说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三峡梯级水电站
1.
Function and implementation of computer monitoring system for Three Gorges cascade hydropower plant
三峡梯级水电站计算机监控系统功能与实现
2.
Changes of fishery resources after the construction of cascade hydropower stations from Longyang gorge to Liujia gorge in upper stream of Yellow River
黄河上游龙羊峡至刘家峡河段梯级水电站建设后鱼类资源变化
3.
DAY-AHEAD OPTIMIZATION SCHEDULES OF THREE GORGES CASCADE HYDROPOWER STATIONS BASED ON TIME-OF-USE ELECTRICITY PRICE;
分时电价下三峡梯级电站在日前电力市场中的优化运营
4.
Application of automatic control and measurement system in TGP-GP step power station model
三峡-葛洲坝梯级电站模型中自动控制及测量系统的应用
5.
cascade hydroelectric power stations on Columbia River
哥伦比亚河梯级水电站
6.
Effects of Three Gorges and Gezhouba reservoirs on river water temperature regimes
三峡-葛洲坝梯级水库水温影响研究
7.
In the end, simulation calculation shows that the proposed method is effective and reliable.
针对三峡梯级水电系统进行仿真计算,结果表明方法是有效的。
8.
Effects of Three Gorges Cascade Reservoirs on River Hydrological Regimes of the Middle and Lower Reaches of the Yangtze River
三峡梯级水库对长江中下游水文情势影响研究
9.
Hydraulic Transients Research of Diversion System in Cascade Hydropower Stations Connected by Open Channel;
梯级电站引水系统水力过渡过程研究
10.
Optimization of reservoirs dispatching of Huaguangtan cascade power stations
华光潭梯级水电站水库优化调度探讨
11.
Discussions on the Unified Price of Electricity Sent into Grid for Cascade Hydropower Stations;
流域梯级水电站统一上网电价的探讨
12.
Ertan hydropower station is the first power station built on Yalong River.
二滩水电站是雅砻江梯级开发的第一个水电站。
13.
Sanxia hydro-power will supply electric power to Henan province after completion of construction.
三峡水电站建成后将向河南电网供电。
14.
A Study on the project of Three Gorges Cascade Reservoir Dispatching Automatization System;
三峡枢纽梯级水库调度自动化系统方案研究
15.
Study and Design on Three Gorges Cascade Reservoir Dispatching Automatization System;
三峡梯级水库调度自动化系统的研究和设计
16.
Professional meteorological support service system for Three Gorges Reservoir cascade operation
三峡水库梯级调度专业气象服务业务系统
17.
The Researching of Turbine Main Parameters Selection for Three Gorges Right Bank Power Station
三峡右岸水电站水轮机参数选择研究
18.
Domestic Manufacture of Three Gorges Power Station 700 MW Hydro-generating Unit
三峡电站700MW水轮发电机组国产化实践