1.
Application of automatic control and measurement system in TGP-GP step power station model
三峡-葛洲坝梯级电站模型中自动控制及测量系统的应用
2.
Effects of Three Gorges and Gezhouba reservoirs on river water temperature regimes
三峡-葛洲坝梯级水库水温影响研究
3.
Joint Dispatch of Three Gorges-Gezhouba Cascade Reservoirs
三峡—葛洲坝梯级枢纽联合调度运用
4.
Application of Joint Optimal Dispatching in the Three Gorges-Gezhouba Cascade Hydro-Complex
联合优化调度在三峡-葛洲坝梯级枢纽的应用
5.
Status and Progress of Operation Techniques Integration on Cascade Project of Three Gorges and Gezhouba
三峡-葛洲坝梯级水利枢纽调度技术集成研究的现状与展望
6.
The overhaul mode research and information management of two hydropower stations in Ge Zhou Ba-the Three Gorges;
葛洲坝和三峡电站检修模式研究及其检修信息管理
7.
Priority Algorithm of Ship Scheduler in the Navigation Co-scheduling System;
三峡—葛洲坝联合调度中的船舶过坝优先级算法研究
8.
Both Gezhouba Project and Three-gorges dam are built in Yichang.
葛洲坝工程和三峡大坝都处在宜昌。
9.
Function and implementation of computer monitoring system for Three Gorges cascade hydropower plant
三峡梯级水电站计算机监控系统功能与实现
10.
Analysis on River Bed Evolution of Gezhouba Reservoir Since the Starting of Three Gorges Project
三峡工程动工来葛洲坝水库河床演变分析
11.
Packing Problem Research of Navigation Co-scheduling System for the Three Gorges Gezhouba Dam;
三峡—葛洲坝联合调度系统闸室编排研究
12.
United Dispatching Model and Arithmetic about Joint Sailing between Three-Gorges Dam and Gezhou Dam;
三峡—葛洲坝通航联合调度模型和算法的研究
13.
Design and Implementation of Navigation Scheduling Information System for Three-Gorge and Gezhou-Dam;
三峡—葛洲坝通航调度信息系统的设计与实现
14.
DAY-AHEAD OPTIMIZATION SCHEDULES OF THREE GORGES CASCADE HYDROPOWER STATIONS BASED ON TIME-OF-USE ELECTRICITY PRICE;
分时电价下三峡梯级电站在日前电力市场中的优化运营
15.
Operation Stability of Gezhouba Hydropower Station after its Capacity Increasing
葛洲坝电站增容改造机组运行稳定性介绍
16.
Impact of daily regulation for hydropower station on navigation conditions of downstream side of Gezhouba project in dry season
电站日调节波对葛洲坝下游枯期通航条件影响
17.
Research of Anti-abrasion of Turbine's Blades of Gezhouba Hydropower Station
葛洲坝水电站水轮机叶片抗磨蚀的研究与防护
18.
Numerical Simulation of Navigable Flow Conditions and Development of Shippings Dispatching System for the Three Gorges & Gezhouba Projects;
三峡葛洲坝通航水流数值模拟及航运调度系统研究