2) Bajiao River Cascade Hydropower Stations
芭蕉河梯级水电站
5) cascade hydropower station
梯级水电站
1.
Combined transaction strategies for cascade hydropower stations in power markets;
电力市场中梯级水电站组合交易策略研究
2.
Research on the short-term optimization schedules of cascade hydropower station based on the time-of-use electricity price on DSM;
DSM分时电价下梯级水电站短期优化运营的研究
3.
Power parameter remote detecting system for cascade hydropower station;
梯级水电站电力参数远程监测系统研究
6) cascaded hydropower plants
梯级水电站
1.
The Algorithm and Application of Optimal Operations for Cascaded Hydropower Plants;
梯级水电站优化运行的算法及应用研究
2.
This paper study the situation of the daily optimal operation on cascaded hydropower plants, expatiate on some theories and methods of the daily optimal operation on cascaded hydropower plants, and discuss the practice of these theory and method carefully.
针对中长期水库调度的实际操作性不强的现状,积极开展水电站(群)短期调度和厂内经济运行理论与方法的研究就显得极为重要,本文就梯级水电站日优化运行问题进行了研究,阐述了梯级水电站群日优化运行的一些理论和方法,并着重探讨了这些理论和方法在实际中的应用。
补充资料:红水河
红水河 在中国广西壮族自治区西北部。西江上游的别称。上游干流南盘江,源出云南省曲靖市马雄山,在广西西林县与清水河汇合后,沿西林、隆林、田林3县至贵州省望谟县双江口汇北盘江后始称红水河,东南流到象州县石龙镇的三江口同柳江汇合处止。全长638千米,流域面积3.32万平方千米(不包括南盘江和北盘江流域面积),年平均流量为696 亿立方米(来宾迁江站)。多峡谷、险滩,水流湍急,不利于航行,但水量大,落差集中,水力资源十分丰富,开发条件优越,可建设10个梯级电站,可开发水能资源的装机容量约1000万千瓦。红水河水力发展梯级开发已被列为国家重点开发项目。
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条