说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 哥伦比亚河梯级水电站
1.
cascade hydroelectric power stations on Columbia River
哥伦比亚河梯级水电站
2.
a tributary of the Columbia River.
哥伦比亚河的一条支流。
3.
Short-time Economic Dispatching Research on Yellow River Multi-reservoir System of Gansu Power System;
甘肃电网黄河梯级水电站短期经济调度研究
4.
Construction features introduction of the Danube R. cascade hydropower station of Austria
奥地利多瑙河梯级水电站建设特色介绍
5.
Study on United Optimal Operation of Cascaded Hydropower Plants in Supahe Drainage Area;
苏帕河流域梯级水电站联合优化调度模型研究
6.
Evaluation Study of Compensating Regulation of Cascade Reservoirs on the Main Stream of Yellow River;
黄河干流梯级水库电站补偿调节方案评价研究
7.
Study on Short-term Optimal Operation of Supahe-River Cascade Hydropower Plants;
苏帕河流域梯级水电站短期优化调度研究
8.
Research on Water Environment Simulation and Water Quality Assessment of the Cascade Hydropower Plant in the Supa River Basin;
苏帕河梯级电站水环境模拟与质量评价研究
9.
Construction Scheme of Subsequent Project of Cascade Hydropower Station in Songjianghe;
松江河梯级水电站后续工程建设方案探讨
10.
Cumulative effect of water environment of existing cascade stations on the upper Yellow River
黄河上游已建梯级电站的水环境累积效应
11.
Computerized Monitoring and Control System of Dadu River Cascade Hydropower Stations Centralized Control Center
大渡河流域梯级水电站群集控中心监控系统
12.
Design and Realization of Computer Control and Supervision System Network in Huoxihe Cascade Hydropower Plants
火溪河梯级水电站监控系统网络设计与实现
13.
Changes of fishery resources after the construction of cascade hydropower stations from Longyang gorge to Liujia gorge in upper stream of Yellow River
黄河上游龙羊峡至刘家峡河段梯级水电站建设后鱼类资源变化
14.
Similar foimations on the Columbia River suggest there may have been as many as 100 floods.
哥伦比亚河上相似的地层说明洪水可能多达100次。
15.
Soil Erosion Impact and Its Control Planning for the Construction of Hydropower Stations in Huma River Development
呼玛河干流梯级水电站开发项目的水土流失影响与防治
16.
Optimum and Comparative Design for Pipe's Material and Diameter in Daheyan Seventh Hydropower Station
大河沿河七级水电站管材、管径优化比选设计
17.
An Outline of the Earthquake of M 6 0 Occurring in Columbia on January 25,1999
1999年1月25日哥伦比亚6.0级地震概况
18.
Short-term Optimal Operation Model for the Cascade Hydroelectric Stations on the Upper Yellow River and Its Solution
黄河上游梯级水电站短期优化调度模型及迭代解法