说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 三峡梯级水电站
1)  Three Georges Cascaded Hydropower Plant
三峡梯级水电站
1.
With the introduction to AGCs implementing principle and main control operation methods-frequency control and power control, this paper narrates what AGC should pay attention to according to the specific condition in Three Georges Cascaded Hydropower Plant.
并根据三峡梯级水电站具体情况阐述了AGC需要考虑之处。
2)  Three Gorges-Gazhouba Cascade Hydroelectric Projects
三峡-葛洲坝梯级电站
3)  Three Gorges Hydropower Station
三峡水电站
1.
Principles and Operation Condition of Reactive Power Regulation of Generating Units at Three Gorges Hydropower Station;
三峡水电站机组无功调节原理及其运行情况分析
2.
Measurement Analysis and Practice of Insulation of Generator Stator Windings on Three Gorges Hydropower Station;
三峡水电站发电机定子绕组绝缘测量分析与实践
3.
Analysis on Vibration Test in Site for Unit of Three Gorges Hydropower Station;
三峡水电站机组现场振动测试分析
4)  Three Gorges Hydropower Plant
三峡水电站
1.
Study on vibration safety of powerhouse under water level of 156 m for 15th unit of Three Gorges Hydropower Plant;
156m水位下三峡水电站15~#机组厂房结构的振动安全研究
2.
Research on the low-head operation stability of left-bank ALSTOM generator units of Three Gorges Hydropower Plant;
三峡水电站ALSTOM机组低水头运行稳定性分析
5)  Three Gorges Project
三峡水电站
1.
Dynamic Characteristics of Three Gorges Project and Features of Hydro-generator Sets;
简单介绍三峡水利枢纽工程,着重叙述三峡水电站的动能特性及水轮发电机组运行特点等。
6)  Three Gorges cascade
三峡梯级
1.
Study on Short-term Optimal Scheduling and the Influence of Unsteady Flow on Navigation of Three Gorges Cascade;
三峡梯级短期优化调度与航运的不稳定流研究
2.
Function and implementation of computer monitoring system for Three Gorges cascade hydropower plant
三峡梯级水电站计算机监控系统功能与实现
3.
The Three Gorges cascade has two hydropower stations at present, they are Three Gorges power station and Gezhouba power station.
讨论在给定葛洲坝一天下泄流量过程的情况下三峡梯级电站发电站发电的情况。
补充资料:长江流域梯级开发


长江流域梯级开发
cascade development on Changjiang River Valley

  水布娅 ﹄勺 n J任500400 300 200100︵已小粗哪袭咪)即帷芭王沱招徕河距清江河口里程(km)~山~~~~一一~~一~-一-~300思龟200 施山 河 图2清江梯级开发方案纵剖面示意 兴建高坝的条件;河道含沙量不大,水库可长期使用, 规划可装机289lMW,多年平均年发电量为84.9亿 kw·h。 清江干流河段分三级开发,即水布娅(1 49lMW)、 隔河岩(1 200MW)、高坝洲(20oMW)(图2)。其中, 隔河岩水电站于1 986年开工,1994年建成。最大坝高 151m,电站装4台单机容量300MW机组。高坝洲水 电站位于隔河岩水电站下游,最大坝 高57m,其水库是隔河岩下游的反调 节水库。水布娅水电站最大坝高 228m,装7台单机容量213MW机 组,是清江干流的骨干电站。 金沙江梯级开发金沙江是长 江上游的重要支流之一。自云南省 石鼓至四川省宜宾的河段长约1300 km,集中落差1685m。宜宾以上流域 面积47.3km“,多年平均流量4610 m3/s,多年平均径流量1456亿m“。 宜宾以上干流可开发水能资源5891。 Mw,多年平均年发电量3233亿kw·h。这口河段由 于水量充沛、落差集中、淹没损失小,动量指标优越, 但区域地质情况复杂,地震烈度大,交通不便,地下工 程量大,所以开发难度大。 按规划,石鼓至宜宾河段拟分8级开发,即虎跳峡有(600oMW)、洪门口(400oMW)、皮厂(5500MW)、站比较集中的一条河流。三座最大的水库分别为两河口(84亿m3)、锦屏一级(100亿m3)和二滩(58亿m“)。前两座是梯级中最大的调节水库。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条