1.
Short-term Optimal Operation Model for the Cascade Hydroelectric Stations on the Upper Yellow River and Its Solution
黄河上游梯级水电站短期优化调度模型及迭代解法
2.
Cumulative effect of water environment of existing cascade stations on the upper Yellow River
黄河上游已建梯级电站的水环境累积效应
3.
Changes of fishery resources after the construction of cascade hydropower stations from Longyang gorge to Liujia gorge in upper stream of Yellow River
黄河上游龙羊峡至刘家峡河段梯级水电站建设后鱼类资源变化
4.
The Theory and Practice of Cascade Hydroelectric Scrolling Development of Huanghe Upstream;
黄河上游梯级水电滚动开发理论与实践
5.
Analysis for the Hydropower Station Monitoring Systems of Upper Reaches of Yellow River Connected to the Cascade Dispatching System
黄河上游水电站监控系统接入梯调电调系统分析
6.
cascade hydroelectric power stations on Columbia River
哥伦比亚河梯级水电站
7.
Short-time Economic Dispatching Research on Yellow River Multi-reservoir System of Gansu Power System;
甘肃电网黄河梯级水电站短期经济调度研究
8.
Effect Analysis and Study on Promoting Its Competitiveness of Cascade Hydropower Development of the Upper Yellow River;
黄河上游梯级水电效益分析及增强竞争力实践研究
9.
Dynamic calculation of power generation compensation benefits of the Yellow River upstream cascade power stations in different level years;
不同水平年黄河上游梯级发电补偿效益的动态计算
10.
Evaluation Study of Compensating Regulation of Cascade Reservoirs on the Main Stream of Yellow River;
黄河干流梯级水库电站补偿调节方案评价研究
11.
Evaluation model for compensating regulation schemes of cascade hydropower stations on the main stream of Yellow River
黄河干流梯级水电站补偿调节方案评价模型研究
12.
Research on Flood Flux Selection during Construction Period under the Modulation of the Cascade Reservoir in the Upstream of the Yellow River;
黄河上游梯级水库调节下施工洪水流量的选择研究
13.
Study on Power Transmission Planning of Longyangxia Upriver Hydropower Cascade Stations;
黄河龙羊峡上游水电站群输电规划研究
14.
Study on Water Temperature Prediction of Cascade Reservoirs in the Upstream of Tuoshengan River;
托什干河上游梯级水库水温预测研究
15.
Aseismatic Safety Analysis of the Cascade Hydroelectric Power Stations on the Lower Jinsha River
金沙江下游梯级水电站抗震安全分析
16.
Huangjinping hydropower station is one of the large-scale step hydropower projects to be developed on Daduhe River recently.
黄金坪水电站是大渡河流域水电梯级近期开发的大型水电工程之一。
17.
Study of Optimized Operation of the Cascade Power Stations in the upper Hanjiang River Based on Electricity Market;
基于电力市场的汉江上游梯级水电站优化调度研究
18.
Analysis of the Influence of Annual Runoff of Constructed Cascade Hydropower Station of the Yellow River in Qinghai Province;
青海境内黄河已建梯级电站对年径流影响分析