说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 水管推顶工程
1)  pipe jacking works
水管推顶工程
2)  pipe jacking engineering
顶管工程
1.
Construction method of in pipe jacking engineering;
顶管工程内穿钢管的施工方法
2.
Analysis of displacement and soil counterforce for working well of pipe jacking engineering
顶管工程工作井位移与土抗力分析
3)  Soil and Water Balanced Top Pipe Project
泥水平衡顶管工程
4)  jacking of sewage pipe
城市污水管顶推
1.
And it is of referential value for the drafting of treatment scheme for settlement caused by jacking of sewage pipe.
文章简介了城市污水管顶推施工时扰动了土体,造成部分路段路基下沉的处理方案、施工工艺及检测方法,并对施工中出现的影响工程质量的一些问题作了深入细致的的研究和探讨,对城市污水管顶推施工时引起道路路面沉陷的处理方案制订具有一定的参考价值。
5)  plumbing works
水管工程
6)  peak pushing craft
顶推工艺
1.
Through the application of the peak pushing craft in frame bridge in Taiyuan Northwest Central Expressway,it introduced the characteristic,difficulty and control main point of this craft which we should pay attention to construction and supervision process.
通过框构桥顶推工艺在太原西北环高速公路的具体应用,介绍了这种工艺在施工与监理过程中应注意的特点、难点和控制要点。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)


坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle

一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条