1)  incremental launching construction
顶推施工
1.
Combined with practical engineering of west bridge in Zhujiang bridge,the author separately illustrates the construction technology and time-limit of traditional bearing changing method and improved bearing as sideway,compares the two bearings,and introduces the selection of new-type bearing,in order to accumulate experience for bridge incremental launching construction.
结合珠江大桥西桥工程实例,分别阐述了传统的更换支座方法的施工工艺及工期和改进支座兼作滑道的施工工艺及工期,并对其进行了比较,最后介绍了新型支座的选型,为桥梁顶推施工积累了经验。
2.
The reasonable arrangement of the launching nose will be critical to the smooth proceeding of incremental launching construction of the whole bridge.
导梁的长度、刚度及重量在顶推施工阶段对顶推主梁的内力有着重要的影响,其合理配置是全桥顺利顶推的关键。
3.
The main shipping channel bridge and the non-navigable span approach bridges of the Bridge respectively make use of the long span continuous composite arch bridges and continuous composite box girder bridges that are all erected by the multi-point and synchro incremental launching construction technique.
其中,引桥顶推施工时,85 m跨间无临时墩;主桥顶推施工时,210 m跨间仅设置1座临时墩。
2)  incremental launching method
顶推施工
1.
In the process of long-span multi-segment continuous curved steel-box girder bridge constructed by incremental launching method,how to adjust the height of temporary piers to insure the safety of steel-box girders and temporary piers is a complex problem.
在进行大跨度多段连续曲线钢箱梁顶推施工过程中,如何通过适时调整临时墩标高来保证钢箱梁及临时墩的受力安全是一个复杂的问题。
2.
The varying depth steel box girder bridge cross Tonghui river, which is a part of connecting line between Second and Forth circle ring road in Beijing , was constructed by incremental launching method.
北京二环、四环联络线跨越通惠河的变高度曲线钢箱梁采用了顶推施工方法。
3.
The construction process simulation and construction control of steel box girder bridge with incremental launching method is studied.
顶推施工不同于悬臂施工,其最大特点在于随着施工过程的进行,结构的坐标、边界支承条件以及相应的结构内力、变形等均在不断地发生变化。
3)  incremental launching
顶推施工
1.
A description is given about the incremental launching technology used in the 96-meter double-track simply-supported trussed girder passing over the second ring road of Beijing.
介绍了京津城际轨道交通工程改京山线96 m双线简支钢桁架梁跨越北京市二环路顶推施工技术,该桥施工时因地制宜,充分利用二环路的辅路空间以尽量减小顶推跨度,上滑道采取间断式布置,下滑道采用不连续多段长滑道,用八三式军用墩器材搭设临时墩,并在主梁前方加设长导梁,顺利完成了钢桁梁顶推架设。
2.
Incremental launching method is popular in long span skew continuous beam bridges which are across canyons because constructing of freeways in the mountains of western China are limited by land feathers 、geological conditions and highway alignment .
0 有机结合,编制了“斜梁桥顶推施工仿真计算分析”程序。
3.
The construction methods of steel box girder in Ji\'nan Huanghe cable-stayed bridge of Qingdao-Yinchuan Highway breaks the traditional incremental launching technology.
青银高速济南黄河大桥斜拉桥钢箱梁施工方法突破了传统的顶推施工工艺,采用在每一个临时墩上设置棘块式顶推设备的方法,实现了由简单的拖拉式顶推到真正意义上的顶推施工方法的转变。
4)  incremental lounching
顶推施工
1.
In box culvert incremental lounching construction,precipitation and covering water are often carried on contemporarily so as to ensure the box culvert and its bottom be avoided the effect of water,and ensure the construction to go on wheels.
在箱涵顶推施工中,为保证箱涵及涵底免受地下水的影响,需要同时进行降水和封水措施,以确保施工的顺利进行。
2.
This paper introduces the application of MATLAB to programming for continuous girder bridge by incremental lounching, particularly for analyzing the course internal force dynamic analysis.
文章介绍了MATLAB语言在顶推施工预应力混凝土连续梁桥施工过程内力动态分析程序设计中的应用 ,从而说明基于MATLAB语言开发结构分析软件的可行性与优越性。
5)  incremental launching construction