1.
The Pushing Technique of the Overpass of Wuxiang Avenue,Nanning,Guangxi
广西南宁市五象大道立交刚架桥顶推工艺
2.
Study on the Jacking Force Induced by Linear and Curved Pipe Jacking Construction;
直线及曲线顶管施工中的顶推力研究
3.
propellant-based technology
推进剂燃烧压裂工艺
4.
Construction technology for adjustment of 1750 t concrete box pier top deviation
1750t混凝土箱梁墩顶偏差调整施工工艺
5.
Waterproofing technology for landscape pond on underground garage
地下车库顶部景观水池防水施工工艺
6.
Analysis on Problems of Top Coal Loading Technique Replaced by Tamping Coking Technique
顶装煤工艺改为捣固炼焦工艺后的问题分析
7.
The Research of Key Problems in the Incremental Launching of Cable-stayed Bridge with Steel Box Girder;
钢箱梁斜拉桥顶推施工关键问题研究
8.
On Multipoints Jacking Construction of Zhujiang Bridge with 5 × 50 m Continuous Box Girder
珠江大桥5×50m连续箱梁多点顶推施工
9.
Hydraulical Model on Slag Splashing for BOF
顶吹转炉溅渣工艺水力学模型的研究
10.
STUDY ON SHAPING TECHNOLOGY OF HOT TOP EMC OF ALUMINUM THIN STRIP
铝薄板热顶-电磁铸造成型工艺研究
11.
Research on Integrated Process of Fixed Roof Tanks with Vapor Recovery System
固定顶油罐与油气回收集成工艺研究
12.
Study on Gateway Top Caving Technology for Steep-inclined Coal Seam
急倾斜煤层巷道放顶煤回采工艺研究
13.
120 tons of converter are equivalent to the bottom compound blowing technology in applying
120t转炉顶底复合吹炼工艺技术应用
14.
Welding procedure and quality control for roofs of type HX_D1 locomotive
HX_D1型机车顶盖焊接工艺及质量控制
15.
Calculation and Analysis of the Key Construction Parameter by Useing EPB Pipe Jacking Method
土压平衡顶管施工工艺参数的计算分析
16.
Jack-up,Pan Reset Scheme and Construction Craft of Bridge Beams
桥梁梁体顶升、平移复位维修方案及施工工艺
17.
Construction of planted deck over parking area of Haitai Innovation base, Tianjin
天津海泰创新基地车库种植顶板施工工艺
18.
Practice of "Two Wining and One Caving" Technique on Blasting and Top-coal Caving Working Face
“两采一放”工艺在炮采放顶煤工作面的实践