1) prefabricated reinforced concrete structure
预制钢筋混凝土结构
2) prefabrication
预制
1.
Quality control in production of oil tank's prefabrication;
石油储罐预制生产中的质量控制
2.
Analysis of the prefabrication construction technology of 35m short box-girder;
浅析35m矮箱梁预制施工工艺
3.
Brief Introduction of Prefabrication and Lifting Process for Box Type Arch Bridge in Yuanmo Expressway,Yunnan;
云南元磨高速公路箱形拱桥预制吊装施工简介
3) prefabricate
预制
1.
This article through carries on the analysis to the Fu-Chao highway roadbed T-beam prefabricated situation,summarizes T-beam to prefabricate in the process the common question as well as the preventive measure,only supplies the reference.
本文通过对阜朝高速公路路基T梁的预制情况进行分析,总结出T梁预制过程中常见的问题以及预防措施,仅供参考。
2.
9m tube used in Guangzhou Pearl River Tunnel is prefabricated by movable moulding bed in dry dock site.
9m 管节,采用整体移动式钢模台车,在干坞中预制。
3.
In order to know the character of them,the contact between them and the crack, and their forming process,we designed a special experiment- prefabricate crack in the shaped blank.
为了弄清此类异质颗粒的性质及其与裂纹之间的联系,以及具有该相同特征的裂纹组织的形成过程,特设计预制裂纹实验方案进行验证,通过试验研究,发现了异质颗粒的性质及其与裂纹之间的联系,判断出具有该相同特征的裂纹组织的形成过程,总结出了影响异质颗粒形成及大小的主要因素。
4) Prefabricated
预制
1.
The prefabricated construction technology of 40m T beam at tropical weather;
热带气候条件下40m T梁预制施工技术
2.
Through a case of Shanghai Rail Line 11 (north section part I), the design plan and construction technique of prefabricated box girder were summarized and compared in this paper, which have gained valuable experience about similar projects.
通过上海市轨道交通11号线北段一期工程的实践,对轨道交通预制轨道箱梁的设计方案和施工工艺进行了简要的归纳和对比,并进行了分析,为预制轨道箱梁的设计和施工积累了一定的经验。
3.
As one of the most significant structure forms in modern architecture,prefabricated concrete structure has the advantages of saving material and labor,improving construction efficiency,accelerating construction speed and lifting construction quality.
预制混凝土结构是现代建筑最重要的结构形式之一,具有节约材料和劳动力,提高施工工效,加快施工进度,提高建筑工程的产品质量等优势。
5) Precast
预制
1.
Capacities of Headed Stud Shear Connectors in Composite Steel Beams with Precast Hollowcore Slabs;
对组合钢梁-预制空心板中栓钉连接件的性能分析
2.
Study on performance of precast glass fiber concrete composite pavement slab under static loading;
预制玻璃钢-砼复合路面板的静力性能研究
3.
Study on construction techniques of precast box girder for passenger special line;
客运专线箱梁预制施工技术研究
6) precasting
预制
1.
Determination of workday consumption for full span box girder precasting;
整孔箱梁预制消耗工天测定
2.
Matters needing attention in T-beam precasting;
T梁预制中需要注意的问题
3.
Precasting and Construction Techniques of 40m PPC Box Girder of Wuhu Yangtze River Bridge;
芜湖长江大桥40m PPC箱梁预制及架设技术
7) shop fabrication
预制
8) preform
预制
9) to prefabricate
预制
10) prefabricate
预制,预制器
补充资料:单层厂房预制钢筋混凝土结构安装
单层厂房预制钢筋混凝土结构安装
installation of singlelayer precast reinforced concrete structure for workshop building
daneeng ehangfong yuzhi gangjinhunningtu JiegouanZhuang单层厂房预制钢筋混凝土结构安装(instal-lation of sidglelayer preeast reinforeed eon-eretestrueture for workshoP building)按设计与施工规范要求,将单层钢筋混凝土结构厂房的构件安装、固定到设计位置上的施工作业。构件组成包括柱、吊车梁、预应力析架(屋架及托架)和屋面板。由于构件单件较重,在受到撞击或不正常外力时易发生裂缝或断裂性损坏,因而安装时需合理地选择吊点,使用吊梁,保持起吊平稳,防止构件(特别是析架)发生抖动;禁止不正常施加外力(拉力、扭力等)强行搬转和矫正。安装方式通常分为单件流水作业和综合作业两种。前者是沿厂房全长先将柱列系统构件安装好,然后安装吊车梁,再安装屋盖系统构件;后者是将某一线的柱、梁、屋盖系统构件全部安装固定后,再安装下一线。在冶金工厂施工中多采用单件流水作业。在单层多跨钢筋混凝土结构厂房安装中,应确定中间部位一个净空较高、跨度较大的跨作为基准跨,该跨安装进度应比邻跨超前2~3线,以利合理地分配误差,避免公差积累。 安装准备除按一般厂房结构安装所要求进行的各项准备外,还应做好下列工作:(1)混凝土柱一般均在现场预制,预制场地需进行夯实,防止地基不均匀下沉而造成构件损坏。(2)析架组立、张拉及灌浆养护条件的准备。(3)拓架起吊平面外刚度的核算及必要的加固措施。(4)朽架吊点、吊梁及索具的选定。(5)预制柱翻转900,以增加柱在起吊时的抗弯能力。(6)析架间距调整器具的设计。 钢筋’混凝土柱的安装柱的起吊有旋转法(起重臂杆绕柱脚旋转而逐渐吊起的操作法)和滑行法(起重臂杆不旋转只提升吊钩的操作法)两种。柱的吊点一般设在牛腿下部。吊装时,按柱身离地面的竖直情况,分为垂直吊法和斜吊法石在起重机起重能力允许的情况下,应优先采用垂直吊法。采取斜吊法时,应用卷扬机和滑轮组拉住柱脚,用辅助主机将柱吊运至杯口。当柱重超过主机起重能力时,可采用双机抬吊。一般在柱子吊点处设有吊装孔,配备专门吊具(吊装轴)进行吊装。不设吊装孔的柱可用绳索直接绑扎吊装,但需采取保护柱棱角的措施,以防柱损伤。柱插入杯口后,应用缆绳及钢楔初步找正、固定,然后用经纬仪在柱相邻的两侧复测柱的垂直度,并量测牛腿的平面标高,确认合格后即可进行永久固定。 重型钢筋混凝土柱常采取分节吊装、高空组接的方法(上、下节柱的钢筋对焊或柱外壁连接板对焊)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条