1) preform
[英][pri:'fɔ:m] [美][pri'fɔrm]
预制件
1.
Methodology research on 3-D braided preform with changed-sections;
变截面三维编织预制件的增减纱机制
2.
Measurement for thickness of carbon fiber three-dimensional braided composite material preforms;
碳纤维三维编织复合材料预制件厚度的测量
3.
Research on pore-forming materials of preform technology;
PRMMC_S预制件制备中造孔剂的应用研究
2) perform
[英][pə'fɔ:m] [美][pɚ'fɔrm]
预制件
1.
T/R module is a key component in phased array radars and requires extremely high performance forpackaging housing materials with light weight, good thermal conductivity, and a low coefficient of thermalexpansion.
本文介绍了小批量T/R组件封装外壳研制中的关键技术,如近净成型预制件技术、真空气压浸渗技术和机械加工技术。
2.
It has important relation between composite materials mechanics and perform thickness and irregularity index, but so far the perform thickness is only measured by hand.
然而,编织物复合后的力学性能与编织物预制件的厚度及其不匀有着重要的关系,但是目前预制件的厚度还只能依靠手工检测。
3) preforms
预制件
1.
The microstructure of the special-shaped 3D braided preforms configurated by reducing-yarn technique is studied by means of experiments and theoretical analysis, in order to set up the braiding technology more strictly.
对通过减纱工艺形成的变截面三维编织预制件的细观结构进行了研究,并采用拓扑方法进行理论分析,得到了减纱后通过减纱截面的纱线运动走向和变化规律,从而为更精确的制定异型三维编织预制件的编织工艺打下了基础。
2.
A study of some sections preforms for compostites produced by weav- ing method has been expounded in the preceding article.
本文仅就用机织法生产复合材料板材预制件的可行性、科类、结构特点及有关的结构设计问题,结合上机织造的实验,进行研究。
4) prefabricate method
预制件法
1.
But the volume fraction of particles in composite fabricated by prefabricate method was finite.
对陶瓷颗粒进行预处理之后,在非真空感应炉中,利用预制件法、无旋涡机械搅拌法和半固态机械搅拌法制备了颗粒增强铝基复合材料。
5) Prefabricated component
预制构件
1.
, which frequently occur on the prefabricated components of port engineering construction, the prevention and control measures are put forwar
通过对水运工程预制构件经常出现的砂线砂斑、蜂窝孔洞等表观缺陷质量通病产生原因的分析 ,提出防治措
2.
Combined with modification work of Shengli Bridge the quality control measures of prefabricated components are elaborated.
结合胜利桥改造工程的实际 ,阐述了该桥所用预制构件的质量控制措施。
6) precast member
预制构件
1.
Analysis on transport,storage and loading quality control of precast members;
预制构件堆放和运输及吊装质量分析
2.
Repair of defects on the appearance quality of precast members;
预制构件外观质量缺陷与修复
补充资料:单层厂房预制钢筋混凝土结构安装
单层厂房预制钢筋混凝土结构安装
installation of singlelayer precast reinforced concrete structure for workshop building
daneeng ehangfong yuzhi gangjinhunningtu JiegouanZhuang单层厂房预制钢筋混凝土结构安装(instal-lation of sidglelayer preeast reinforeed eon-eretestrueture for workshoP building)按设计与施工规范要求,将单层钢筋混凝土结构厂房的构件安装、固定到设计位置上的施工作业。构件组成包括柱、吊车梁、预应力析架(屋架及托架)和屋面板。由于构件单件较重,在受到撞击或不正常外力时易发生裂缝或断裂性损坏,因而安装时需合理地选择吊点,使用吊梁,保持起吊平稳,防止构件(特别是析架)发生抖动;禁止不正常施加外力(拉力、扭力等)强行搬转和矫正。安装方式通常分为单件流水作业和综合作业两种。前者是沿厂房全长先将柱列系统构件安装好,然后安装吊车梁,再安装屋盖系统构件;后者是将某一线的柱、梁、屋盖系统构件全部安装固定后,再安装下一线。在冶金工厂施工中多采用单件流水作业。在单层多跨钢筋混凝土结构厂房安装中,应确定中间部位一个净空较高、跨度较大的跨作为基准跨,该跨安装进度应比邻跨超前2~3线,以利合理地分配误差,避免公差积累。 安装准备除按一般厂房结构安装所要求进行的各项准备外,还应做好下列工作:(1)混凝土柱一般均在现场预制,预制场地需进行夯实,防止地基不均匀下沉而造成构件损坏。(2)析架组立、张拉及灌浆养护条件的准备。(3)拓架起吊平面外刚度的核算及必要的加固措施。(4)朽架吊点、吊梁及索具的选定。(5)预制柱翻转900,以增加柱在起吊时的抗弯能力。(6)析架间距调整器具的设计。 钢筋’混凝土柱的安装柱的起吊有旋转法(起重臂杆绕柱脚旋转而逐渐吊起的操作法)和滑行法(起重臂杆不旋转只提升吊钩的操作法)两种。柱的吊点一般设在牛腿下部。吊装时,按柱身离地面的竖直情况,分为垂直吊法和斜吊法石在起重机起重能力允许的情况下,应优先采用垂直吊法。采取斜吊法时,应用卷扬机和滑轮组拉住柱脚,用辅助主机将柱吊运至杯口。当柱重超过主机起重能力时,可采用双机抬吊。一般在柱子吊点处设有吊装孔,配备专门吊具(吊装轴)进行吊装。不设吊装孔的柱可用绳索直接绑扎吊装,但需采取保护柱棱角的措施,以防柱损伤。柱插入杯口后,应用缆绳及钢楔初步找正、固定,然后用经纬仪在柱相邻的两侧复测柱的垂直度,并量测牛腿的平面标高,确认合格后即可进行永久固定。 重型钢筋混凝土柱常采取分节吊装、高空组接的方法(上、下节柱的钢筋对焊或柱外壁连接板对焊)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条