说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 预制块
1)  preform [英][pri:'fɔ:m]  [美][pri'fɔrm]
预制块
1.
The research of preform fabrication teachnique of magnesium matrix composites;
镁基复合材料预制块制备工艺的研究
2.
Present technologies of preform of hybrid reinforced metal matrix composites,sorts of binders,drying methods and sintering processes are surveyed.
对混杂增强金属基复合材料增强相预制块从不同方面进行了详细的介绍,对混杂增强金属基复合材料增强相预制块制备工艺技术、粘结剂类别、烘干烧结工艺等研究现状进行了综述,指出了预制块制备中存在的问题,提出了今后的发展方向。
3.
High quality preforms are important for discontinuously reinforced composites made by the pressure infiltration method.
采用压力浸渗方法制备非连续增强复合材料需要高质量的预制块
2)  precast block
预制块
1.
Brief introduction of building furnace with refractory precast block
采用耐火浇注料预制块筑炉简介
2.
The research shows that the carbon absorption rate can be up to 90% approximately by using the pretreated carbon powder and precast block penetration method.
研究表明,经过预处理的碳粉,采用预制块压入法可使碳的吸收率稳定在90%左右。
3.
Test and study of coal ash concrete for precast block of slope protection ofriver course is carried out for applying coal ash concrete to slope protection project.
为了使粉煤灰混凝土应用于河道护坡工程,进行了河道护坡预制块粉煤灰混凝土的试验研究,在原混凝土配合比的基础上掺入一定量的粉煤灰,实验结果表明,粉煤灰混凝土是一种降低能耗、增加强度、降低成本、节约资金的有效途径。
3)  precast concrete block
砼预制块
1.
The material quality is poor in Cixi city, it s feasible and economic to using the precast concrete block instead of stone in the bank protection.
慈溪市山塘资源相对贫乏,且材料质量差,选用砼预制块代替干砌石护坡,不论从施工上还是经济上都是确实可行的,在河道整治中也是一种符合现代化施工管理的新办法。
4)  fabricated language unit
语块预制
1.
Hence force, it is suggested that ‘internet chat vie fabricated language units’ be put into practice in college English oral teaching and learning.
如何在现有的条件下,加强大学英语的口语教学?本文认为“语块预制、网上聊天”不失为一种有效的手段和新尝试。
5)  precast lining
预制垫块
6)  prefabricated chunk
预制语块
1.
As a lexical-grammatical unit,prefabricated chunk is the smallest unit and the subject of language usage and communication.
文章阐述了预制语块的概念和分类,分析了预制语块在大学英语写作中的作用和功能,探讨了大学英语写作中的预制语块形式,并据此对大学英语写作提出一些建议。
2.
This thesis,from the point of prefabricated chunk,analysis existing problems in present vocabulary teaching and propose to improve language productive competence and change the ineffective vocabulary teaching by means of strengthening prefabricated chunk study.
预制语块在语言输入和输出方面有着得天独厚的优势,是语言学习的理想单位。
3.
It is worthwhile to study the way words are combined into patterns and to teach students verbs as prefabricated chunks.
研究这种结合方式的内在规律性 ,将动词模式作为预制语块进行教学的方法值得探讨。
补充资料:单层厂房预制钢筋混凝土结构安装


单层厂房预制钢筋混凝土结构安装
installation of singlelayer precast reinforced concrete structure for workshop building

daneeng ehangfong yuzhi gangjinhunningtu JiegouanZhuang单层厂房预制钢筋混凝土结构安装(instal-lation of sidglelayer preeast reinforeed eon-eretestrueture for workshoP building)按设计与施工规范要求,将单层钢筋混凝土结构厂房的构件安装、固定到设计位置上的施工作业。构件组成包括柱、吊车梁、预应力析架(屋架及托架)和屋面板。由于构件单件较重,在受到撞击或不正常外力时易发生裂缝或断裂性损坏,因而安装时需合理地选择吊点,使用吊梁,保持起吊平稳,防止构件(特别是析架)发生抖动;禁止不正常施加外力(拉力、扭力等)强行搬转和矫正。安装方式通常分为单件流水作业和综合作业两种。前者是沿厂房全长先将柱列系统构件安装好,然后安装吊车梁,再安装屋盖系统构件;后者是将某一线的柱、梁、屋盖系统构件全部安装固定后,再安装下一线。在冶金工厂施工中多采用单件流水作业。在单层多跨钢筋混凝土结构厂房安装中,应确定中间部位一个净空较高、跨度较大的跨作为基准跨,该跨安装进度应比邻跨超前2~3线,以利合理地分配误差,避免公差积累。 安装准备除按一般厂房结构安装所要求进行的各项准备外,还应做好下列工作:(1)混凝土柱一般均在现场预制,预制场地需进行夯实,防止地基不均匀下沉而造成构件损坏。(2)析架组立、张拉及灌浆养护条件的准备。(3)拓架起吊平面外刚度的核算及必要的加固措施。(4)朽架吊点、吊梁及索具的选定。(5)预制柱翻转900,以增加柱在起吊时的抗弯能力。(6)析架间距调整器具的设计。 钢筋’混凝土柱的安装柱的起吊有旋转法(起重臂杆绕柱脚旋转而逐渐吊起的操作法)和滑行法(起重臂杆不旋转只提升吊钩的操作法)两种。柱的吊点一般设在牛腿下部。吊装时,按柱身离地面的竖直情况,分为垂直吊法和斜吊法石在起重机起重能力允许的情况下,应优先采用垂直吊法。采取斜吊法时,应用卷扬机和滑轮组拉住柱脚,用辅助主机将柱吊运至杯口。当柱重超过主机起重能力时,可采用双机抬吊。一般在柱子吊点处设有吊装孔,配备专门吊具(吊装轴)进行吊装。不设吊装孔的柱可用绳索直接绑扎吊装,但需采取保护柱棱角的措施,以防柱损伤。柱插入杯口后,应用缆绳及钢楔初步找正、固定,然后用经纬仪在柱相邻的两侧复测柱的垂直度,并量测牛腿的平面标高,确认合格后即可进行永久固定。 重型钢筋混凝土柱常采取分节吊装、高空组接的方法(上、下节柱的钢筋对焊或柱外壁连接板对焊)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条